Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Environmental Services
  5. ›OMH Bronx Psychiatric Center PCB Remediation Transformer…

Dormitory Authority of the State of New York·New York

OMH Bronx Psychiatric Center PCB Remediation Transformer Rooms 1 & 2

Closes 7/16/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

THIS SOLICITATION IS FOR EXPRESSIONS OF INTEREST (EOI) ONLYSee the Eligibility Requirements further down in this document. The scope of work consists of, but is not limited to, PCB remediation in transformer rooms, including associated cleaning, decontamination, and disposal of impacted materials. Estimated Cost Range for Scope of Work: $1,900,000 - $2,100,000. Bidders for the construction of this project will be selected only after the review and evaluation of the qualification packages received in response to this notice. Please note that the project drawings and specifications attached to DASNY’s website associated with this solicitation do not reflect 100% construction / bid documents. The documents provided are for reference only. Finalized construction / bid documents shall be distributed to the qualified contractors invited to bid. Please find links to the specifications and drawings below:Drawings 381660Specifications 381660 General Conditions for Construction dated February 4, 2026, will apply to the Contract Documents.The anticipated goals for EEO and M/WBE participation in the Work of the Contract are as follows:Percent of Total Work Force (EEO): Minority & Women Workforce Goal (for all trades) 45%Percent of Total Contract (M/WBE): Minority Business Enterprise Goal 18% Women's Business Enterprise Goal 12% Service-Disabled Veteran Owned Businesses 6%Please note the Owner will determine the goals for EEO and M/WBE participation when the finalized construction / bid documents are distributed to the qualified contractors invited to bid.Firms shall provide one (1) copy in pdf format of the EOI package via e-mail to [email protected]. Instructions for Submission of the EOI Packages:Each firm responding to this solicitation shall submit an EOI package organized and assembled in a clear, logical and professional manner consistent with the requirements set forth herein. Failure to comply with these instructions may render the submission non-responsive and subject to rejection. Each package shall be submitted with:A Cover Page that clearly identifies:The Legal Name of the Company submitting the EOIThe Project Name for which the EOI is being submittedThe Date of Submission Immediately following the Cover Page, the contractor shall provide a Table of Contents listing all Tabbed sections, exhibits and attachments contained in the submission with the corresponding page number. The EOI package shall be divided into clearly labeled tabbed sections, each separated by a Cover Sheet identifying the contents that follow. Tabs should correspond to the order of the items specified in the solicitation. All items outlined in each Tab must be provided. The Owner may reject any EOI package not prepared and submitted in accordance with the provisions as stated in this solicitation. Tabs must be in the following sequence: Tab 1 – Company ProfileProvide a company profile that includes the following information: Company Contact – Name, Title, E-mail address, and Phone Number of primary point of contact for this project. Date Established – When the company was founded. Company Address – Primary business location. Ownership Information – Name and resumes of all principal owners. Client List – Summary of public and private sector clients. Employee Breakdown – Number of employees by role: Architects, Engineers, Project Managers, Administrative Staff, Superintendents and Foremen, Trade Laborers. Equipment - Overview of all equipment owned by the company. Self-Performed Services - Description of all services the company performs directly (not subcontracted). MWBE and SDVOB Certifications – Provide a copy of the company’s MWBE and/or SDVOB certifications (if applicable). Tab 2 – ExperienceProvide documentation showing a minimum of five (5) years of experience with projects similar in size, scope, and complexity to the one being proposed. Provide details for the five (5) relevant projects that have been completed- or substantially completed- within the last ten (10) years. For each project, include the following information: Name of the project designerFirm name and contact informationProject title and location/facilityBrief description of the projectTotal construction costConstruction start dateSubstantial completion dateIndicate role as prime contractor or subcontractorPercentage of the work that was self-performed If applicable, also include a list of all DASNY projects completed within the last 5 years. Tab 3 – Project SchedulesProvide three (3) sample project schedules for the same projects listed in Tab 2. These schedules should reflect projects of similar size, scope, and complexity to the referenced project. Tab 4 – Safety ProgramProvide the firm’s written safety program or site safety plan. Include the résumé of the person responsible for overseeing project safety.Tab 5 – RésumésProvide names and résumés for the proposed project team. Each résumé should demonstrate experience with at least one project of similar size, scope, and complexity to the referenced project. Team members should include, at minimum: Project Manager, Site Superintendent, Project Engineer, and Quality Control Representative.Tab 6 – Potential SubcontractorsProvide a list of potential subcontractors for this project. For each potential subcontractor, identify anticipated M/WBE subcontract participation, the subcontractor’s trade, and brief description of their scope of work.Tab 7 – Anticipated WorkloadProvide a list other projects you firm will be working on during this project’s construction period. Include a statement explaining how your firm will successfully complete this project within the required timeframe. Tab 8 – Experience Modification RatingProvide a letter from your insurance provider indicating the firm’s Experience Modification Rating (EMR) over the past three (3) years. If your EMR is above 1.00, include a written explanation. Tab 9 – Bonding CapacityProvide a signed letter from a Surety Company attesting to your firm’s single, aggregate and available bonding capacity. If your available bonding capacity does not to meet the bonding requirements of this contract, you must explain how your firm will meet the bonding requirements. Tab 10 – NYS Vendor Responsibility QuestionnaireProvide your online or hardcopy NYS Vendor Responsibility Questionnaire For-Profit Construction (CCA-2) certified within the last five (5) months. Firms shall provide the Certification page for the online version or the full questionnaire, if submitting a hardcopy. Eligibility/Qualifications Requirements/Preferences: Tabs 1 through 7 will be scored by a DASNY committee. Firms deemed qualified from this solicitation will be included on a short list and invited to submit a bid in the near future. Firms not following the EOI package requirements as noted shall be considered non-responsive to the advertisement. The construction contract will be held by DASNY. Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details. In accordance with State Finance Law § 139-j and § 139-k, this solicitation includes and imposes certain restrictions on communications between Dormitory Authority personnel and an Offerer during the procurement process. Designated staff for this procurement are: The Project Manager and [email protected]. Contacts made to other Dormitory Authority personnel regarding this procurement may disqualify the Offerer and affect future procurements with governmental entities in the State of New York. Please refer to the Authority's website (www.dasny.org) for Authority policy and procedures regarding this law, or the OGS website (www.ogs.state.ny.us/aboutogs/regulations/defaultAdvisoryCouncil) for more information about this law. All proposers, domestic and foreign, must be in compliance with New York State business registration requirements. Contact the NYS Department of State regarding compliance. In addition, business entities proposing to provide professional engineering services must obtain a Certificate of Authorization to Provide Engineering Services in New York State from the State Education Department. Proposals must be submitted in the full legal name of the proposer, or the full legal name plus a registered assumed name of the proposer, if any.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
6/18/2026
Closes
7/16/2026

Last updated

Details

Industry
Environmental Services
NAICS
562910

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS Titan Roofing, Inc.·New York

Top match · 67%

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 10/7/2026

New York City Health + Hospitals·New York

65% match

24202204: NCB OTxHU Main Construction

Closes 11/25/2026Opened 10/2/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

45298 CONSTRUCTION – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

45298 PLUMBING – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

The University of Iowa·Iowa

64% match

UI Health Care - John W. Colloton Pavilion - LL - Replace MRI in Room 0457 ID075

Closes 11/10/2026Opened 10/21/2026

U.S. Department Of Justice·New York

64% match

MDC BROOKLYN - REMOVE AND REPLACE SHOWER PARTITIONS

Closes 11/13/2026Opened 10/20/2026

NYS OGS Design & Construction - Construction Contractors·New York

64% match

45298 HVAC – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

Dormitory Authority of the State of New York·New York

64% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 9/25/2026

Mental Health, NYS Office of·New York

63% match

Preventive Maintenance of Generator & Ancillary Equipment

Closes 11/23/2026Opened 10/15/2026

County of Santa Clara·California

63% match

Residential Treatment Facility Continuum of Care

Closes 2/23/2028Opened 2/24/2023

New York City Department of Sanitation·New York

63% match

82726B0005-Bronx Community Districts 9, 10 & 11 Garage Demolition and Replacement, 800 Zerega Avenue, Bronx, NY 10473 and South Lot Swing Space, 530 Zerega Avenue, Bronx, NY 10473

Closes 3/4/2027Opened 7/20/2026

Dormitory Authority of the State of New York·New York

63% match

OMH Hutchings Psychiatric Center Replace Boilers in Buildings 16 & 17 including Asbestos and Hazardous Materials Abatement

Closes 11/19/2026Opened 10/14/2026

NYS OGS Design & Construction - Construction Contractors·New York

63% match

45298 ELECTRICAL – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

CUNY Baruch College·New York

63% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

Nyc Department of Social Services·New York

63% match

06922P0021-Provision of Scattered-Site Supportive Housing

Rolling / TBD closeOpened 12/12/2025

NYS OGS Design & Construction - Construction Contractors·New York

62% match

Replace Electrical Panels – Electrical Panel Replacement and Generator Installation Project

Closes 11/18/2026Opened 10/13/2026

UCLA Capital Programs·California

62% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 25 - Electrical)

Rolling / TBD closeOpened 10/23/2026

New York City Health + Hospitals·New York

62% match

Correction: Upgrade IDF MDF Rooms

Closes 11/19/2026Opened 10/7/2026

UCLA Capital Programs·California

62% match

RRUMC 4TH Floor Patient Care Reconfiguration (BP 11 - Demolition, Concrete, Framing and Drywall)

Closes 12/3/2026Opened 10/26/2026

New York City Department of Environmental Protection·New York

62% match

82626B0015-BWT-TI-181 Replacement of the Multi-Rake Climber Screen & Degritting System Installation

Closes 12/2/2026Opened 10/21/2026

Dormitory Authority of the State of New York·New York

62% match

OMH Hutchings Psychiatric Center Replace Boilers in Buildings 16 & 17 including Asbestos and Hazardous Materials Abatement

Closes 11/19/2026Opened 10/14/2026

County of Santa Clara·California

62% match

Behavioral Health Treatment Facility Continuum of Care

Closes 2/23/2028Opened 2/24/2023

Mental Health, NYS Office of·New York

62% match

Crisis Stabilization Centers

Closes 12/29/2026Opened 10/14/2026

New York City Department of Health and Mental Hygiene·New York

62% match

OPEN-ENDED – JUSTICE INVOLVED SUPPORTIVE HOUSING

Rolling / TBD closeOpened 11/3/2023

Dormitory Authority of the State of New York (DASNY)·New York

62% match

MWBE & SDVOB Opportunities - Baruch College South Campus Boilers and Asbestos Abatement, Baruch College

Closes 11/2/2026Opened 10/5/2026