The project involves dredging and placement of sand along the Fire Island Inlet and shores west of Jones Inlet, New York, to provide a required beach profile. The basic work includes mobilization and demobilization, dredging, transportation, and placement of 800,000 cubic yards of sand along Gilgo Beach shoreline and 700,000 cubic yards along the same shoreline. The project also includes four options for additional work, each involving the placement of sand along Overlook Beach shoreline. The options can be exercised within 65 calendar days of the notice to proceed. The project duration is estimated to be 166 calendar days, with additional days for mobilization and demobilization.
• The project requires the removal of material except ledge rock lying above the plane of 14 feet below mean lower low water, plus 2 feet allowable overdepth.
• The project involves the placement of sand along the beach shoreline to provide the required beach profile.
• The options for additional work include the placement of 35,000, 35,000, and 30,000 cubic yards of sand along Overlook Beach shoreline.
• The contractor must bid on all items, and failure to do so will result in rejection of the bid.
• The award of the contract will be based on the responsible and responsive bidder with the lowest total price for the total of the basic work and options.
Attached files
Contact
Nicole C. Fauntleroy(Contracting Officer's Representative)
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.