Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Construction
  5. ›SLOAN ROAD - DECATUR BOULEVARD TO LAS VEGAS BOULEVARD

Nevada Government·Nevada

SLOAN ROAD - DECATUR BOULEVARD TO LAS VEGAS BOULEVARD

Closes 9/15/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

This Clark County Invitation for Bid seeks qualified contractors to perform a comprehensive roadway rehabilitation on Sloan Road between Decatur Boulevard and Las Vegas Boulevard. The scope includes removal of existing pavement, processing of old Portland cement concrete (PBS) and base material, road widening, replacement of a failing culvert, concrete pavement grinding, and a PBS mill and overlay using Ultra‑Thin Asphalt Concrete System (UTACS). Work will be performed during night hours and will require traffic control, pilot cars, and maintenance of two‑way traffic throughout construction. • Remove existing pavement and process old PBS/base for reuse • Widen roadway and replace failing culvert • Perform concrete pavement grinding and PBS milling • Apply UTACS overlay • Conduct all activities at night with full traffic management and pilot‑car support

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Scott Basquiát‑Jones

[email protected]

(702) 455-4441

Key dates

Opened
8/25/2026
Questions due
9/8/2026
Pre-bid meeting
9/1/2026
Closes
9/15/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
607992-26 Addendum 2

Budget estimate

$2,000,000 – $5,000,000

No contract value is disclosed in the solicitation. Based on typical costs for a multi‑lane urban road reconstruction—including demolition, base processing, culvert replacement, night‑time traffic control, and UTACS overlay—a project of this length and complexity in the Las Vegas area would likely range from roughly $2 million to $5 million. Factors influencing the final amount include the exact roadway length, material quantities, night‑work premiums, and any unforeseen subsurface conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Clark County·Nevada

Top match · 71%

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026

Nevada Government·Nevada

70% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Nevada Government·Nevada

69% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Idaho Transportation Department·Idaho

64% match

Key No. 21923 US-26, JCT. HITT ROAD (25th E)

Closes 11/24/2026Opened 10/30/2026

Knox County·Tennessee

62% match

TURN LANES AND TRAFFIC SIGNAL AT SCHAAD ROAD AND JOHNSON ROAD

Closes 12/3/2026Opened 10/29/2026

City of Tucson·Arizona

61% match

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

Closes 11/20/2026Opened 8/19/2026

City of Richmond Government·Virginia

61% match

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

Idaho Transportation Department·Idaho

61% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

City of Fort Wayne·Indiana

61% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

Idaho Transportation Department·Idaho

60% match

Key No. 23731 NORTHSIDE BLVD & KARCHER RD

Closes 11/17/2026Opened 10/29/2026

LA Public Works Engineering Bureau·California

60% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Bluewing Civil Consultants, LLC.·Louisiana

60% match

West Interstate Dr. and Walmart Dr. Roadway Improvements – Project No. 226011

Closes 11/9/2026Opened 10/14/2026

Lexington County·South Carolina

60% match

Roadway Improvements for Hass Lucas Road

Closes 11/20/2026Opened 10/16/2026

U.S. Department Of Transportation·Wyoming

60% match

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

NYS Monroe County·New York

60% match

Traffic Signal Replacement: South Clinton Avenue @ Elmwood Avenue

Closes 12/1/2026Opened 10/29/2026

City of Rock Hill·South Carolina

60% match

SCP: Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026

City of Toledo·Ohio

59% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026