Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Belle Fountain Ditch Cleanout Phase 2

U.S. Department Of Defense·Missouri

Belle Fountain Ditch Cleanout Phase 2

Closes in 2 days$1M – $5MInvitation for Bid
Get bids like this by emailBid source

Description

The project calls for a complete channel cleanout of the Belle Fountain Ditch system in Pemiscot County, Missouri, including the Bypass of Steele and Main Ditch. The contractor must provide all labor, plant, and materials to clear the ditch from the confluence of New Franklin Ditch through to a point 100 ft before County Road 442, following provided plans and specifications. This is a Service‑Disabled Veteran‑Owned Small Business set‑aside using sealed bid procedures. • Scope includes full ditch excavation, debris removal, and incidental work as required by the plans. • Work location spans approximately 2.5 miles of ditch, starting at the New Franklin Ditch confluence and ending near County Rd 442. • Contractor must be capable of handling heavy civil engineering construction with a small‑business size standard of $45 M.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sequoria Chatmon

[email protected]

(901) 544-0973

Key dates

Opened
10/13/2026
Closes
11/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
W912EQ26BA002

Budget estimate

$1,000,000 – $5,000,000

No contract value is disclosed, but the NAICS small‑business size standard is $45 M, indicating the project is likely a multi‑million‑dollar effort. Based on the length (≈2.5 mi) and heavy‑civil nature, a reasonable estimate ranges from $1 M to $5 M, accounting for labor, equipment, materials, and contractor overhead.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Missouri

Top match · 80%

Levee Repairs at Saline County Levee District #2, Ray-Carroll Bottoms Consolidated Levee District of Carroll County, and Howard County Levee District #4

Closes 2/5/2027Opened 11/26/2025

U.S. Department Of Defense·Missouri

80% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

Clay County·Florida

79% match

County Road 220 Phase 2 – Milling and Resurfacing

Closes 11/30/2026Opened 10/15/2026

Lucas County Engineer·Ohio

79% match

2026 Springfield Township O.P.W.C. Road Improvement Project, Phase 2

Closes 11/10/2026Opened 10/26/2026

U.S. Department Of Defense·Missouri

79% match

Missouri Valley Levee Repairs

Closes 1/20/2027Opened 1/20/2026

Town of Church Point·Louisiana

79% match

CHURCH POINT DETENTION AND FLOOD PROOFING PHASE 2 FOR THE LOUISIANA WATERSHED INITIATIVE

Closes 11/10/2026Opened 10/14/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

79% match

Abandoned Mine Drainage Abatement Project – Oven Run Site B (AFVFP Stone Cleaning) – Shade Township, Somerset County

Closes 11/19/2026Opened 10/23/2026

City of Redding·California

79% match

STILLWATER BUSINESS PARK PROJECT – PHASE 2A - TREE REMOVAL

Closes 11/5/2026Opened 10/20/2026

Georgia Tift County Board of Commissioners·Georgia

79% match

Water, Street & Drainage Improvements - W Phillipsburg Phase 2

Closes 11/17/2026Opened 10/16/2026

Maryland Baltimore County Government·Maryland

78% match

23001 SX0 Long Quarter Interceptor Rehabilitation

Closes 11/12/2026Opened 9/19/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

78% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Town of Upton·Wyoming

78% match

Phase 2.2 - Wyoming & Montana Avenues, Improvements

Closes 11/6/2026Opened 10/23/2026

West Virginia Department of Environmental Protection·West Virginia

78% match

AML- Simpson Creek Highwall, Tipple and Portals Phase II

Closes 11/23/2026Opened 10/26/2026

Georgia Bulloch County Board of Commissioners·Georgia

78% match

Mill Creek Parking Lot FDR Project

Closes 11/20/2026Opened 10/29/2026

U.S. Department Of Defense·Louisiana

78% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 8/10/2026

Jefferson Parish Government·Louisiana

78% match

Bid Event # 185 - JEFFERSON PARISH WATERLINE IMPROVEMENTS SOUTH NEW ORLEANS SUBDIVISION JEFFERSON PARISH PROJECT NO. 2023-028-WRB

Closes 11/17/2026Opened 10/7/2026

Greenville County·South Carolina

78% match

CLASS 2 LANDFILL PARTIAL CLOSURE

Closes 11/16/2026Opened 10/23/2026

City of El Cajon·California

78% match

BROADWAY CREEK RESTORATION - PHASE B

Closes 11/16/2026Opened 10/14/2026

Commonwealth of Kentucky·Kentucky

78% match

RFB-105-27 Big Bone Lake Dam Decommissioning

Closes 12/2/2026Opened 10/27/2026

U.S. Department Of Defense·South Carolina

78% match

FY26 Clouter Creek Middle and Highway Cell Diking

Closes 12/2/2026Opened 10/27/2026

Missouri Department of Transportation·Missouri

78% match

St. Louis District, St. Louis County, Hanley Road – Laclede Station Road between Manchester Road and Newport Avenue resurfacing, curb ramp upgrades, and traffic signal improvements

Closes 11/4/2026Opened 5/4/2026

County of Frederick, MD·Maryland

78% match

Water Distribution Improvements Phase II

Closes 11/10/2026Opened 9/9/2026

City of Oldsmar·Florida

78% match

State Street Drainage Ditch Improvements Project

Closes 11/19/2026Opened 9/25/2026

U.S. Department Of The Interior·Colorado

78% match

GCI Pollyanna #2 Acid Mine Drainage Remediation Pr

Closes 11/6/2026Opened 9/30/2026

Commonwealth of Pennsylvania - Department of Conservation and Natural Resources·Pennsylvania

78% match

Rehabilitate Sewage Treatment Plant – Parker Dam State Park – Huston Township, Clearfield County, Pennsylvania

Closes 12/3/2026Opened 10/28/2026