Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Nevada guideNevada Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Nevada
  4. ›Construction
  5. ›Durango Drive Rehabilitation - Russell Road to Tropicana…

Nevada Government·Nevada

Durango Drive Rehabilitation - Russell Road to Tropicana Boulevard, Fort Apache/Tompkins Intersection Improvements, Tropicana/Conquistador Improvements, Russell Road Rehabilitation - Hualapai Way to Grand Canyon Drive, and Cactus/Jones Improvements

Closes 9/3/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Clark County is seeking qualified firms or individuals to bid on a multi‑segment arterial street rehabilitation project in the Las Vegas area. The scope includes pavement removal and replacement, ADA‑compliant sidewalk ramps, street lighting upgrades, median construction, concrete curb & gutter, permanent striping and signage, utility adjustments, storm‑drain improvements, fencing, traffic‑signal modifications, and associated demolition, disposal, traffic‑control, dust‑control, and quality‑control activities as shown on the project drawings. The work is divided among several corridors: Durango Drive (Russell Rd to Tropicana Blvd), Fort Apache/Tompkins intersection, Tropicana/Conquistador corridor, Russell Rd (Hualapai Way to Grand Canyon Dr), and Cactus/Jones improvements. Bids must be submitted electronically via a WebEx portal by September 3, 2026. A pre‑bid WebEx meeting is scheduled for August 17, 2026 to answer questions. • Project location: Clark County, Nevada (Las Vegas metropolitan area) • Primary work: heavy civil construction – pavement, sidewalks, lighting, drainage, traffic‑signal upgrades • Estimated contract magnitude: multi‑million‑dollar, likely $5 M‑$15 M based on similar county street rebuilds • Mandatory bid submission format: electronic via WebEx; no physical site‑visit required • Key dates: Issue 8/10/2026, Pre‑bid 8/17/2026, Questions cut‑off 8/24/2026, Bid close 9/3/2026 • Contact: Scott Basqui­at‑Jones (Bid Contact)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Scott Basqui­at‑Jones

scott.basqui‑at‑[email protected]

(702) 455‑4441

Key dates

Opened
8/10/2026
Questions due
8/24/2026
Pre-bid meeting
8/17/2026
Closes
9/3/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
607997-26 Addendum 2

Budget estimate

$5,000,000 – $15,000,000

The solicitation does not disclose a contract value. Based on the extensive scope—multiple arterial corridors, pavement replacement, ADA‑compliant sidewalks, lighting, drainage, and signal upgrades—a typical county street‑rehabilitation contract of this size in Nevada ranges from roughly $5 million to $15 million. Factors influencing the final amount include the length of each roadway segment, existing pavement condition, utility relocation complexity, and any unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Transportation·Wyoming

Top match · 69%

WY NP YELL 10(24), Grand Loop Road Norris to Golden Gate, Phase 3

Closes 9/23/2028Opened 10/20/2026

City of Tucson·Arizona

69% match

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

Closes 11/20/2026Opened 8/19/2026

City of Fort Wayne·Indiana

68% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Transportation·Arizona

68% match

AZ BL COLO 7528(1) Burro Creek Road

Closes 11/17/2026Opened 10/15/2026

Nevada Government·Nevada

68% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

Clark County·Nevada

67% match

Las Vegas Boulevard - Flamingo Road to Spring Mountain Road (Phase G) and Flamingo Road - I-15 to Koval Lane

Closes 11/4/2026Opened 10/14/2026

Alaska Department of Transportation and Public Facilities (DOT&PF)·Alaska

66% match

DOT&PF Notice of Public Open House: Klondike Highway Rehabilitation: Skagway River Bridge to Black Lake

Rolling / TBD closeOpened 9/15/2026

City of Tucson·Arizona

66% match

Sahuara and Copper/Flower Bicycle Boulevards - FHWA

Closes 11/3/2026Opened 9/24/2026

Illinois Tollway·Illinois

66% match

RR-26-2066 - Roadway & Bridge Rehabilitation & Plaza Improvements

Closes 12/3/2026Opened 10/26/2026

U.S. Department Of Transportation·Colorado

66% match

CO BR UCPO Blue Mesa Road(1) Blue Mesa Road

Closes 12/1/2026Opened 10/27/2026

U.S. Department Of Transportation·Alaska

66% match

AK NPS DENA 10(64), Re-pave Riley Creek Campground Roads

Closes 9/18/2027Opened 9/28/2026

Nevada Government·Nevada

66% match

LAS VEGAS BOULEVARD - FLAMINGO ROAD TO SPRING MOUNTAIN ROAD (PHASE G) AND FLAMINGO ROAD - I-15 TO KOVAL LANE

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of The Interior·Colorado

65% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

City of El Paso De Robles·California

65% match

Riverside Avenue Improvements from 17th to 21st Street

Closes 11/5/2026Opened 9/24/2026

U.S. Department Of Transportation·Hawaii

65% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

Alaska Department of Transportation and Public Facilities·Alaska

65% match

RTP Grant Application - Rehabilitation of Multi-Purpose Trail in Galena

Rolling / TBD closeOpened 9/24/2026

U.S. Department Of The Interior·Utah

65% match

Z--DINO REPLACE SWING ARM GATES

Closes 11/18/2026Opened 9/23/2026

Alaska Recreational Trails Program·Alaska

65% match

RTP Grant Application - Bonita Loop

Rolling / TBD closeOpened 9/24/2026

California Department of Transportation·California

65% match

Reconstruct roadway and drainage system, & construct ADA facilities.

Closes 12/9/2026Opened 10/26/2026

County of Santa Cruz·California

65% match

Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects

Closes 11/5/2026Opened 10/8/2026

U.S. Department Of Transportation·Colorado

65% match

TX FW LGA 10(5) Steve Thompson Wildlife Drive

Closes 11/3/2026Opened 10/1/2026

City of Shawnee·Kansas

65% match

Resolution No. 2056

Closes 4/22/2030Opened 4/22/2025

U.S. Department Of Transportation·Washington

64% match

ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1

Closes 8/20/2028Opened 8/20/2026

City of Doge City·Kansas

64% match

Trail St & Overpass CCLIP (closed 10/20)

Rolling / TBD closeOpened 9/15/2026

Municipality of Anchorage·Alaska

64% match

Old Seward Highway Surface Rehabilitation – International Airport Rd to Tudor Rd – Phase 2

Closes 11/5/2026Opened 10/7/2026