The M-ARK Project Inc is seeking a contractor to dig 6 test pits along the foundation of the future Inn at Kirkside. The work entails digging of the pits and taking detailed photos of the pits, with a tape measure depth to the footing, and labeled 1-6 per the attached drawing. The contractor must also provide a shoring plan to be approved by the engineer. The project requires the contractor to expose the edge of the foundation and its depth, and to measure the depth at both sides of the wall. The contract term is 2025-2026, and the total MWBE participation goals are 30%.
• The contractor must dig 6 test pits along the foundation of the future Inn at Kirkside
• The work entails taking detailed photos of the pits, with a tape measure depth to the footing, and labeled 1-6 per the attached drawing
• The contractor must provide a shoring plan to be approved by the engineer
• The project requires the contractor to expose the edge of the foundation and its depth
• The contractor must measure the depth at both sides of the wall
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.