The district is seeking a qualified contractor to demolish the existing Glen A. Wilson High School press box and install a new prefabricated press box with associated structural, mechanical, electrical, and security upgrades. The contract is awarded to the lowest responsive and responsible bidder based solely on the base bid. Bids must be sealed, include a 10 % bid security and a 100 % performance/payment bond, and comply with California prevailing‑wage and labor‑code requirements.
• Demolition of existing press box, base, and foundation; new concrete footings and anchor‑bolt installation.
• Installation of a 42‑ft × 8‑ft prefabricated press box, metal‑panel cladding, roof hatch, guard rail, motorized security shutters, and three PTAC HVAC units.
• Updated electrical, low‑voltage, AV, CCTV, and intrusion‑detection systems per revised DSA‑approved drawings; all work must meet Title 24, CCR, and 2021 IBC with 2022 California amendments.
• Mandatory pre‑bid conference/site walk on February 18, 2026; sealed bids due March 12, 2026 at 3 pm at the District Office; 90‑day bid‑withdrawal restriction.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.