Cube Construction Services LLC is soliciting proposals for South Beach Psychiatric Center Building 7 Interior Renovation, Window Replacement and associated asbestos abatement project located at South Beach PC, 777 Seaview Avenue, Staten Island, NY 10305.
Please use the link below to access the project drawings, specifications and Addenda:
https://www.dropbox.com/scl/fo/sv3i2jwrafpg7hv6ghoba/AI4LASBGoyjeaDP0rxLF67Q?rlkey=xlhm9w9v0g9vgfuk0ov9bf20m&st=lufvhwby&dl=0
Scope of work is including but is not limited to the following:
Removal of materials affected with visible mold growth at gypsum board ceiling at the areas specified on the project documents.
All work associated with removal of asbestos containing glue at cove base, vinyl floor tile, linoleum flooring with mastic, sink undercoat, GWB at perimeter of window frame, ceiling tiles and mastic, joint compound, lintel waterproofing and brick at wall opening.
Removal of PCB containing caulking at window frame and vertical expansion joint in the specified locations.
All work associated with demolition of raised floor system, carpet flooring, LVT floor, quarry tiles and associated accessories down to the substrate, prep surfaces to receive new finishes.
Demolition of millwork, shelving, corner guards, chair rails, water fountain, chillers, toilet accessories and plumbing fixtures in its entirety in the specified areas.
Removal of canopy, wall mounted equipment, windows, frames, window sills, shades, window bars, doors, frames, threshold with associated hardware and accessories per the project documents.
Selective demolition of brick wall to facilitate installation of new storefronts, doors and frames, windows in the locations specified on the project documents.
All work associated with demolition of wall surfaces down to existing studs including wall tile, wall mounted heaters, Fan coil units, FRP wall panels, GWB, surface mounted conduits and accessories, ceiling, access panels, soffit, light fixtures, ceiling-mounted devices, grilles as delineated in the project documents.
Provide new interior finishes including acoustical ceiling panels, resilient flooring, linoleum flooring, ceramic tile, porcelain tile with associated wall base and accessories.
Provide new gypsum board wall partitions with framing, insulation and accessories.
All work associated with replacement of damaged or missing bricks and repointing per the exterior elevations and details. Provide exterior masonry lintels.
Provide exterior penetrations as required for installation of new Fan coil units and louvers, patching and around the openings to match existing brick facade.
Provide new HM doors, frames and hardware; aluminum storefronts and glazed aluminum windows with associated hardware per the door and window schedule.
Provide new plumbing fixtures and toilet accessories for renovation of bathrooms on both floors as specified.
Provide new walk off matts, transition strips, acoustic wall covering and speciality wall coverings in the locations specified on the project documents.
Millwork scope of work including plastic laminate faced architectural cabinets, solid surface countertops at nurse station and bathrooms.
Removal of existing insulation at drain piping serving the FCU's, insulation at condensate piping per the demolition plans and procedure.
Removal of transfer air grille along with attached ductwork, bypass dampers, fin tube radiators, window AC, wall mounted cabinet unit heater, toilet exhaust fan, air outlets with associated controls.
Mechanical scope including new fan coil units, fin tube radiators with thermostats, cabinet unit heaters, registers, grilles, air outlets, volume dampers.
Provide insulation for condensate drain piping, ductwork, FCU supply and return piping as specified.
All work associated with duct vacuum cleaning in the area of work as per the procedure specified in the project documents.
Removal of existing light fixtures, exit signs, receptacles and associated branch circuit, wiring, conduits and controls.
Electrical scope of work including new exit signs, light fixtures, branch circuits, wiring, conduits, new panels and connection of devices to new branch panels as specified.
Removal of existing plumbing fixtures, drains and piping at first and second floor per the demolition plans.
Plumbing scope of work including new plumbing fixtures, floor drains and piping for the toilet and showers per the project documents.
Provide new sprinkler system including sprinkler heads, piping with associated accessories per the sprinkler drawings and specifications.
Modification of fire alarm system by providing new devices, relocation of existing devices with associated wiring, tie-in to the existing system and programming.
Please provide us with your proposal including but not limited to:
Labor
Material
Equipment
Permits
Testing
Inspections, etc.
This project is subject to Project Labor Agreement (PLA).
If you are interested, please provide us with your proposal on or before noon 12/01/25.
Thank you, let us know if you have any questions.
Service-Disabled Veteran-Owned Business (SDVOB)
SDVOB Goal: 6.00%
Minority / Women Business Enterprise contracting goals (MWBE)
MBE Goal: 18.00%
WBE Goal: 12.00%
Disadvantaged Business Enterprise contracting goals (DBE)
DBE Goal: 0.00%