Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Construction
  5. ›?DASNY: South Beach Psychiatric Center Building 7 Interior…

DASNY·New York

?DASNY: South Beach Psychiatric Center Building 7 Interior renovation, window replacement with associated asbestos abatement: RFP

Closes 12/4/2025$500k – $2MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Cube Construction Services LLC is soliciting proposals for South Beach Psychiatric Center Building 7 Interior Renovation, Window Replacement and associated asbestos abatement project located at South Beach PC, 777 Seaview Avenue, Staten Island, NY 10305. Please use the link below to access the project drawings, specifications and Addenda: https://www.dropbox.com/scl/fo/sv3i2jwrafpg7hv6ghoba/AI4LASBGoyjeaDP0rxLF67Q?rlkey=xlhm9w9v0g9vgfuk0ov9bf20m&st=lufvhwby&dl=0 Scope of work is including but is not limited to the following: Removal of materials affected with visible mold growth at gypsum board ceiling at the areas specified on the project documents. All work associated with removal of asbestos containing glue at cove base, vinyl floor tile, linoleum flooring with mastic, sink undercoat, GWB at perimeter of window frame, ceiling tiles and mastic, joint compound, lintel waterproofing and brick at wall opening. Removal of PCB containing caulking at window frame and vertical expansion joint in the specified locations. All work associated with demolition of raised floor system, carpet flooring, LVT floor, quarry tiles and associated accessories down to the substrate, prep surfaces to receive new finishes. Demolition of millwork, shelving, corner guards, chair rails, water fountain, chillers, toilet accessories and plumbing fixtures in its entirety in the specified areas. Removal of canopy, wall mounted equipment, windows, frames, window sills, shades, window bars, doors, frames, threshold with associated hardware and accessories per the project documents. Selective demolition of brick wall to facilitate installation of new storefronts, doors and frames, windows in the locations specified on the project documents. All work associated with demolition of wall surfaces down to existing studs including wall tile, wall mounted heaters, Fan coil units, FRP wall panels, GWB, surface mounted conduits and accessories, ceiling, access panels, soffit, light fixtures, ceiling-mounted devices, grilles as delineated in the project documents. Provide new interior finishes including acoustical ceiling panels, resilient flooring, linoleum flooring, ceramic tile, porcelain tile with associated wall base and accessories. Provide new gypsum board wall partitions with framing, insulation and accessories. All work associated with replacement of damaged or missing bricks and repointing per the exterior elevations and details. Provide exterior masonry lintels. Provide exterior penetrations as required for installation of new Fan coil units and louvers, patching and around the openings to match existing brick facade. Provide new HM doors, frames and hardware; aluminum storefronts and glazed aluminum windows with associated hardware per the door and window schedule. Provide new plumbing fixtures and toilet accessories for renovation of bathrooms on both floors as specified. Provide new walk off matts, transition strips, acoustic wall covering and speciality wall coverings in the locations specified on the project documents. Millwork scope of work including plastic laminate faced architectural cabinets, solid surface countertops at nurse station and bathrooms. Removal of existing insulation at drain piping serving the FCU's, insulation at condensate piping per the demolition plans and procedure. Removal of transfer air grille along with attached ductwork, bypass dampers, fin tube radiators, window AC, wall mounted cabinet unit heater, toilet exhaust fan, air outlets with associated controls. Mechanical scope including new fan coil units, fin tube radiators with thermostats, cabinet unit heaters, registers, grilles, air outlets, volume dampers. Provide insulation for condensate drain piping, ductwork, FCU supply and return piping as specified. All work associated with duct vacuum cleaning in the area of work as per the procedure specified in the project documents. Removal of existing light fixtures, exit signs, receptacles and associated branch circuit, wiring, conduits and controls. Electrical scope of work including new exit signs, light fixtures, branch circuits, wiring, conduits, new panels and connection of devices to new branch panels as specified. Removal of existing plumbing fixtures, drains and piping at first and second floor per the demolition plans. Plumbing scope of work including new plumbing fixtures, floor drains and piping for the toilet and showers per the project documents. Provide new sprinkler system including sprinkler heads, piping with associated accessories per the sprinkler drawings and specifications. Modification of fire alarm system by providing new devices, relocation of existing devices with associated wiring, tie-in to the existing system and programming. Please provide us with your proposal including but not limited to: Labor Material Equipment Permits Testing Inspections, etc. This project is subject to Project Labor Agreement (PLA). If you are interested, please provide us with your proposal on or before noon 12/01/25. Thank you, let us know if you have any questions. Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 6.00% Minority / Women Business Enterprise contracting goals (MWBE) MBE Goal: 18.00% WBE Goal: 12.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 0.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Bhavana Tattukolla(Estimator)

[email protected]

(908) 331-1497

Key dates

Opened
11/24/2025
Closes
12/4/2025

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
236220
Solicitation №
3734909999 CR16

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work, which includes interior renovation, window replacement, and asbestos abatement. The project involves a significant amount of work, including demolition, installation of new finishes, and replacement of damaged or missing bricks. Considering the complexity and scale of the project, a rough estimate for the budget could be between $500,000 and $2,000,000. This estimate is based on industry standards for similar projects and takes into account the costs of labor, materials, and equipment. However, the actual budget may vary depending on various factors, such as the number of bidders, the complexity of the project, and the client's budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

NYS OGS Design & Construction - Construction Contractors·New York

Top match · 76%

45298 HVAC – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

NYS Titan Roofing, Inc.·New York

76% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 10/7/2026

New Jersey Division of Property Management and Construction (NJ DPMC)·New Jersey

75% match

Project: AFKC-STU-Annex Roof Replacement - Ann Klein Forensic Center – Special Treatment Unit Annex

Closes 12/15/2026Opened 10/28/2026

U.S. Department Of Defense·Pennsylvania

75% match

RM16-1405 BUILDING 592 RENOVATIONS

Closes 12/1/2026Opened 10/28/2026

Massachusetts Yarmouth Housing Authority·Massachusetts

74% match

Window Replacement

Closes 11/19/2026Opened 10/28/2026

NYS OGS Design & Construction - Construction Contractors·New York

74% match

45298 CONSTRUCTION – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

California Department of State Hospitals·California

74% match

26-10026-000 BLDG 536, ROOMS 42 & 43 CONVERSION, PROJECT# A24-00043

Closes 12/9/2026Opened 10/29/2026

U.S. Department Of Veterans Affairs·Oregon

74% match

Y1DA--REDO CON 653-27-106 Remodel Bathrooms Bldg 1 A Wing Floors 1 and 2

Closes 1/21/2027Opened 10/14/2026

CUNY Baruch College·New York

74% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

U.S. Department Of Veterans Affairs·Oregon

74% match

Y1DA--CON-NRM 653-27-101 Refresh Halls And Walls B1

Closes 11/28/2026Opened 8/21/2026

NYS OGS Design & Construction - Construction Contractors·New York

73% match

45298 PLUMBING – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

Dormitory Authority of the State of New York·New York

73% match

OMH Hutchings Psychiatric Center Roof Replacement & Associated Asbestos & Hazardous Material Abatement Buildings 6, and 11 (Phase 1 – Buildings 6 and 11)

Closes 11/5/2026Opened 9/25/2026

U.S. Department Of Veterans Affairs·New York

73% match

F108--620-26-206 Asbestos Abatement

Closes 11/20/2026Opened 10/30/2026

LA County Public Works·California

73% match

BRC0000667 - On-Call Commercial and Institutional Recycling Program

Closes 11/10/2026Opened 10/5/2026

U.S. Department Of Veterans Affairs·Washington

73% match

5650--American Lake B81 Lab Roof

Closes 11/1/2026Opened 9/2/2026

County of Marin·California

73% match

CAP 41C2511 Marin City Fire Station Dormitory Reconfiguration

Closes 11/5/2026Opened 10/19/2026

NYC Health + Hospitals·New York

73% match

Bid Extension: Elmhurst Hospital, Entryway Renovation

Closes 11/4/2026Opened 7/2/2026

UCLA Capital Programs·California

73% match

RRUMC 4TH Floor Patient Care Reconfiguration (BP 11 - Demolition, Concrete, Framing and Drywall)

Closes 12/3/2026Opened 10/26/2026

San Diego County Regional Airport Authority·California

73% match

Quieter Home Program Phase 14 Group 12

Closes 11/12/2026Opened 10/12/2026

U.S. Department Of Veterans Affairs·Oregon

73% match

Y1DZ--653-26-110 Light Remodel Bldg 17

Closes 11/26/2026Opened 8/19/2026

County of Marin·California

73% match

Marin City Fire Station Dormitory Reconfiguration

Closes 11/5/2026Opened 10/15/2026

New York City Health + Hospitals·New York

73% match

Correction: Steam Tank Modernization at Elmhurst Hospital Center

Closes 11/4/2026Opened 9/1/2026

Dormitory Authority of the State of New York·New York

73% match

OMH Hutchings Psychiatric Center Replace Boilers in Buildings 16 & 17 including Asbestos and Hazardous Materials Abatement

Closes 11/19/2026Opened 10/14/2026

Dedham Housing Authority·Massachusetts

72% match

Unit Renovation

Closes 11/10/2026Opened 10/21/2026

U.S. Department Of Veterans Affairs·California

72% match

FY27 NRM Replace Flooring in McClellan VA Northern California Health Care System McClellan CA Project 612A4 27 020

Closes 11/17/2026Opened 10/19/2026