Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›MSFC High Pressure Liquid Nitrogen Pump Replacement

National Aeronautics And Space Administration·Alabama

MSFC High Pressure Liquid Nitrogen Pump Replacement

Closes 1/8/2026$6M – $7MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The National Aeronautics and Space Administration (NASA) is seeking information from qualified firms capable of providing Design-Build services for the design and construction of equipment and controls upgrades for the High Pressure LN2 Facility at Redstone Arsenal, Huntsville, Alabama. The project aims to modernize 1960's era technology by replacing liquid nitrogen pumps, associated piping, valves, controls, and ancillary systems with a new automated system designed for durability, reliability, and reduced operational costs. The upgraded system will maintain or improve current capacity while reducing the number of pumps required. • The project involves replacing minimum 5,000 PSIG system pumps and minimum 10,000 PSIG system pumps with modernized equipment. • The project includes all new unloading pumps and circulator pumps. • The project requires all piping to be upgraded or replaced, including valves and other components. • The project involves automating all valve actuation and pump operation, with manual backup, and implementing a facility control system. • The project requires integration with current vaporization towers and instrumentation of various data points. • The project includes general facility upgrades and repairs, such as concrete foundation under pumps, electrical distribution, catwalk for operator access, foundation repairs, unloading station pavement/concrete repairs, walkway repairs, welding repairs, and painting.

Attached files

Contact

Alicia Reynolds

[email protected]

(256) 544-3107

Key dates

Opened
12/18/2025
Closes
1/8/2026
Duration
18 months

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
236210
Solicitation №
MSFCPS30-PROC-26001

Budget estimate

$6,000,000 – $7,000,000

The estimated cost of the project is between $6,000,000 and $7,000,000. This estimate is based on the information provided in the document, which mentions that the Government is seeking industry feedback on the extent to which the full scope of the modernization project can be successfully executed within this estimated budget. The actual budget may vary depending on the proposals received and the final scope of work. Factors that may influence the likely payment range include the complexity of the project, the number of pumps required, and the extent of the upgrades and repairs needed.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

North Carolina City of Raleigh·North Carolina

Top match · 65%

EM Johnson WTP 605 High Service Pump Replacement

Closes 12/8/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

63% match

43--HOUSING,LIQUID PUMP

Closes 11/17/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

63% match

43--HOUSING,LIQUID PUMP

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Health And Human Services·Maryland

62% match

Liquid Nitrogen Gas (LN2) service for Clinical Biorepository Freezers

Closes 11/16/2026Opened 10/30/2026

City of Branson·Missouri

62% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026

U.S. Department Of Defense·Ohio

62% match

Vacuum Turbo Pumps

Closes 11/13/2026Opened 10/14/2026

U.S. Department Of Defense·United States of America

62% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/8/2026Opened 9/24/2026

Metropolitan Council·Minnesota

62% match

St. Paul OMF Water Vacuum System Upgrades

Closes 11/10/2026Opened 10/7/2026

North Carolina City of Raleigh Public Utilities Department·North Carolina

62% match

EM Johnson WTP

Closes 12/7/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

61% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

61% match

16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/15/2026

U.S. Department Of Defense·Oklahoma

61% match

PUMP, FUEL, JET ENGINE; NSN 2915-01-597-1095PR

Closes 11/19/2026Opened 10/19/2026

U.S. Department Of Defense·Oklahoma

60% match

PUMP, RECIPROCATING, NSN# 4320012622626FW, PN# UA538823-4

Closes 11/3/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

60% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

60% match

TRANSMITTER,LIQUID

Closes 11/5/2026Opened 10/8/2026

U.S. Department Of Defense·Maine

60% match

43--HOUSING,LIQUID PUMP

Closes 11/17/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

60% match

FD2030-26-01688

Closes 8/11/2027Opened 8/11/2026

U.S. Department Of Defense·North Carolina

60% match

Building SH50 Replace Water Source Heat Pump

Closes 11/19/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

60% match

POWER SUPPLY

Closes 11/30/2026Opened 10/29/2026

City of Fort Myers·Florida

60% match

Sole Source - Xylem Water Solutions - Flygt Lift Station Pumps

Closes 11/4/2026Opened 10/14/2026

U.S. Department Of Defense·Texas

60% match

PUMP, CENTRIFUGAL, COOLANT

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·Pennsylvania

60% match

16--NRP,BOTTLE MONEX FI- AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/2/2026Opened 9/15/2026

U.S. Department Of Agriculture·Minnesota

60% match

Superior NF Water Heater replacement

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·Maryland

60% match

NSWCCD York Chill Pump Replacement

Closes 11/16/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

60% match

48--HIGH STAGE PRECOOLE, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/7/2026