The City of Winston-Salem is seeking bids for the Piedmont Propulsion Structural Floor Infill project, which involves modifying the existing 14,000 square foot First Floor Level storage space and the existing Basement Floor Level space below to create manufacturing space on both floor levels. The project includes dismantling and reinstalling the recessed steel framing floor structure, constructing new steel floor decking, and installing a concrete slab floor system. The construction duration is 180 calendar days, with a liquidated damages clause of $750/day. A mandatory pre-bid conference will be held to explain the scope of work and answer technical questions. The project has a subcontracting goal of 10% M/WBE.
• The project involves modification of existing storage space and creation of manufacturing space on two floor levels.
• The project includes dismantling and reinstalling the recessed steel framing floor structure.
• New steel floor decking and a concrete slab floor system will be constructed.
• The construction duration is 180 calendar days.
• A liquidated damages clause of $750/day applies.
• A mandatory pre-bid conference will be held to explain the scope of work and answer technical questions.