Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›IFB 10219595 - Cured-In-Place Pipe (CIPP) lining services

California Department of Water Resources·California

IFB 10219595 - Cured-In-Place Pipe (CIPP) lining services

Closes 7/7/2026$3M – $6MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Department of Water Resources is seeking a qualified contractor to provide full‑segment Cured‑In‑Place Pipe (CIPP) lining services for approximately 300 culvert pipes and 50 gate‑riser manholes located within State Plan of Flood Control (SPFC) levees in the Sacramento and San Joaquin River basins. The work includes material supply, equipment, labor, design (per ASTM standards), installation, CCTV inspections, temporary cofferdam and de‑watering, gate procurement/installation, traffic‑control crew, concrete encasement, and warranty inspections. The contractor must hold a California General Contractor license, have at least three years of CIPP experience, meet minimum installed‑liner footage thresholds, be DIR‑registered, and provide required bonds and insurance. The contract is anticipated to run for four years with unit‑price pricing and fixed‑price line items for additional work such as gate replacement and unforeseen permits. • Supply and install CIPP liners (access‑point‑to‑access‑point) for ~300 culverts (≈60 ft average length) and ~50 gate‑riser manholes. • Perform full design responsibility per ASTM F‑1216, ASTM F‑2019, ASTM D5813, and related standards; include CCTV inspections and warranty inspections. • Provide required bonds (10 % bid bond, 100 % performance and payment bonds), insurance, DIR registration, and DVBE participation (≥ 3 %).

Attached files

Contact

Wesley McCandless(Contract Specialist)

[email protected]

(916) 902-7850

Key dates

Opened
6/3/2026
Questions due
6/17/2026
Closes
7/7/2026
Duration
4 years

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
IFB 10219595

Budget estimate

$3,000,000 – $6,000,000

No total contract price is disclosed, but the solicitation covers roughly 300 culverts (average 60 ft) and 50 gate‑riser manholes. Assuming an average unit price of $200–$300 per foot for CIPP liner installation on smaller pipes and $400–$600 per foot for larger-diameter sections, plus $5,000–$10,000 per manhole liner, the overall contract value is likely in the $3–6 million range. Factors influencing the estimate include pipe diameter mix, depth, site‑specific de‑watering needs, and any additional gate‑replacement work.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Buy Board Purchasing Cooperative·Texas

Top match · 82%

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Thermo Cured Products)

Closes 11/12/2026Opened 9/4/2026

Buy Board Purchasing Cooperative·Texas

80% match

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Ultraviolet-Light Cured Products)

Closes 11/12/2026Opened 9/4/2026

City of Marysville, Ohio·Ohio

79% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City Utilities·Indiana

74% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

Gary Sanitary District·Indiana

73% match

Request For Quotes Sanitary Sewer Lining at 8535 Lakewood Avenue

Closes 11/5/2026Opened 10/21/2026

Georgia Brunswick‑Glynn County Joint Water and Sewer Commission·Georgia

73% match

ITB No. 27-006 Construction Services for Basin 4001 and 4013 CIPP Rehabilitation

Closes 11/10/2026Opened 10/7/2026

Georgia City of Sandy Springs·Georgia

72% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

West County Wastewater·California

72% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of West Des Moines·Iowa

72% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Appleton, WI·Wisconsin

71% match

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026Opened 10/20/2026

City of Beaumont·California

71% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Greenwood Metropolitan District·South Carolina

70% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

Pennsylvania Department of Transportation·Pennsylvania

70% match

SR117 Thermoform PVC Pipe Lining

Closes 11/3/2026Opened 10/15/2026

City of Chula Vista·California

70% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

Delaware County Regional Sewer District·Ohio

69% match

2025 Sewer Rehabilitation Project

Closes 11/17/2026Opened 10/13/2026

City of Bellevue·Washington

69% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

City of Ann Arbor·Michigan

69% match

2027 Sewer Lining Project

Closes 12/2/2026Opened 10/30/2026

City of Redlands·California

69% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Augusta County Service Authority dba Augusta Water·Virginia

68% match

ITB 2702 Augusta Water Collection System Rehabilitation

Closes 12/3/2026Opened 10/29/2026

City of Albany·Georgia

68% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

City of San Bernardino·California

68% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

Saline County·Kansas

68% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

City of Whitehall·Ohio

68% match

Beechbank and Broadhurst Sewer Rehabilitation

Closes 11/13/2026Opened 10/28/2026

California Department of Transportation·California

67% match

SB/MB Option - IFPQ -Thermoplastic Polyolefin (TPO) Roofing System Installation and Repair Services

Closes 11/5/2026Opened 9/29/2026

City of Dayton·Ohio

67% match

IFB 27005N Water Main Pipe, Fittings, Valves and Related Supplies

Closes 11/9/2026Opened 10/28/2026