The project involves the construction of four reinforced concrete high explosive Box-H type, earth covered magazines with seismic updates and two modular storage magazines in Sigonella, Italy. The project also includes the construction of a single story, high-bay, drive-through maintenance facility for Ammunition Rework and Overhaul Shop (AROS). The facility will serve the receipt, storage, segregation, and issue (RSSI) of ordnance as well as the assembly, build-up, disassembly, maintenance, and breakdown of munitions. The scope of work includes site preparation, conduit infrastructure for Intrusion Detection System (IDS), lightning protection and grounding systems, overhead lighting, and roadway access.
• The project requires the construction of four earth covered magazines and two modular storage magazines.
• The project includes the construction of a single story, high-bay, drive-through maintenance facility for AROS.
• The facility will serve the RSSI of ordnance and the assembly, build-up, disassembly, maintenance, and breakdown of munitions.
• The scope of work includes site preparation, conduit infrastructure for IDS, lightning protection and grounding systems, overhead lighting, and roadway access.
• The project will be awarded as a firm fixed price contract, with a period of performance of approximately 1,400 days after notice to proceed.