Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Louisiana guideLouisiana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Louisiana
  4. ›Construction
  5. ›GLASGOW AVENUE SIDEWALKS (Hyacinth Avenue – Perkins Road)…

City of Baton Rouge - Parish of East Baton Rouge·Louisiana

GLASGOW AVENUE SIDEWALKS (Hyacinth Avenue – Perkins Road) CPP 24-EN-HC-0026

Closes 8/27/2026$500k – $2MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Baton Rouge and Parish of East Baton Rouge are seeking bids for the design‑build construction of sidewalks along Glasgow Avenue, covering grading, earthwork, concrete sidewalks, drainage structures, and sub‑surface drainage. The project requires a 5% bid bond, compliance with Louisiana contractor licensing, and a minimum 10% goal for socially and economically disadvantaged business enterprises (SEDBE). Bids are accepted electronically or on paper until the deadline, with bid openings via teleconference. • Scope: Grading, earthwork, concrete sidewalk installation, drainage structures, sub‑surface drainage. • Requirements: 5% bid bond, active contractor license (highway, street & bridge construction), EBE documentation, compliance with state licensing law. • Submission: Electronic or sealed bids accepted through Central Bidding portal or paper forms; deadline 2 p.m. CDT, 18 August 2026. • Evaluation: Firm for 60 days; bid opening via teleconference; SEDBE goal of 10% of contract amount. • Contacts: Primary contact – George Chike, P.E. ([email protected]).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

George Chike(Engineer)

[email protected]

Key dates

Opened
7/24/2026
Closes
8/27/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
CPP 24-EN-HC-0026 (29351809)

Budget estimate

$500,000 – $2,000,000

The project involves extensive earthwork, concrete paving, and drainage systems across a municipal corridor; comparable sidewalk‑to‑road projects in Louisiana typically range from $0.5 million to $2 million depending on length, site conditions, and material specifications. Assuming a moderate length (~0.5‑1 mile) with standard concrete and drainage, a realistic bid would fall within the $500,000‑$2,000,000 range.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Ontario·California

Top match · 67%

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

New York City Department of Design and Construction·New York

66% match

HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

New York City Department of Design and Construction·New York

65% match

HWCB27KR: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

City of Seattle·Washington

65% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

City of Fresno·California

64% match

Chestnut Neighborhood Sidewalks

Closes 11/17/2026Opened 10/16/2026

Municipality of Anchorage·Alaska

64% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Indianapolis·Indiana

64% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

Central Midlands Council of Governments·South Carolina

64% match

Sidewalk Additions along Drayton Street, Park Street, Vanderhorst Street, and Chalmers Street

Closes 11/5/2026Opened 10/2/2026

City of Sacramento·California

64% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

Nyc Department of Design and Construction·New York

64% match

85027B0025 - HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

NYS Rochester, City of·New York

64% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

City of Rock Hill·South Carolina

64% match

SCP: Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements

Closes 11/18/2026Opened 10/9/2026

City of Fresno·California

63% match

Pave More Now Package S-2.1: Bullard & Forkner Traffic Signal & Sidewalk Upgrades and Herndon EB Left-Turn Extension

Closes 11/10/2026Opened 10/9/2026

City of Portland·Maine

63% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

Nyc Department of Design and Construction·New York

63% match

85027B0026 - HWCB27KR : REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

New York City Department of Transportation·New York

63% match

84127P0001-TD/CSS for Crocheron Park Pedestrian Bridge Over BCIP, Borough of Queens

Closes 11/6/2026Opened 9/28/2026

City of Philadelphia·Pennsylvania

63% match

PW Bid 3993ECMS - MPMS 82199 Cottman Ave Redesign with GSI

Closes 12/3/2026Opened 10/16/2026

City of Charlotte·North Carolina

63% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

City of Charlotte·North Carolina

63% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Ponca·Oklahoma

63% match

Street Improvement-Queens Avenue-SST 27-1

Closes 11/11/2026Opened 9/11/2026

City of Cincinnati·Ohio

63% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/6/2026Opened 9/10/2026

Georgia City of College Park·Georgia

63% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

City of Hesperia·California

63% match

2025 DECEMBER ADVERSE WEATHER EMERGENCY REPAIRS: CEDAR STREET AND BANDICOOT TRAIL

Closes 11/12/2026Opened 9/23/2026

City of Fargo·North Dakota

63% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Pasadena·California

63% match

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026