Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›California
  4. ›Construction
  5. ›Hopper Ave Corridor Fire Recovery Improvements Project

City of Santa Rosa·California

Hopper Ave Corridor Fire Recovery Improvements Project

Closes 1/27/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Hopper Ave Corridor Fire Recovery Improvements Project involves the rehabilitation of the Hopper Ave Corridor between Coffey Ln and Airway Dr, damaged by the 2017 Tubbs Fire. The project includes the addition of minor water/sewer improvements, replacing and realigning 1,155 LF sewer main and 167 LF of water main. The project requires a contractor to perform the construction work, and the bid proposal must include all costs to perform the work as specified, including labor, materials, supplies, and equipment. Key aspects of the project include: • Rehabilitation of the Hopper Ave Corridor • Replacement and realignment of sewer and water mains • Compliance with utility company standards • Implementation of a stormwater pollution prevention plan • Adherence to erosion and sediment control measures • Performance of construction work in accordance with the contract documents and specifications.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Felicia Ong(Contract Administrator or similar role, exact title not specified)

[email protected]

(707) 543-3864

Key dates

Opened
1/7/2026
Pre-bid meeting
1/20/2026
Closes
1/27/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
C02406

Budget estimate

$5,000,000 – $15,000,000

Based on the scope of work, which includes rehabilitation of the Hopper Ave Corridor and replacement of utility lines, the estimated budget for this project could range from $5 million to $15 million. This estimate takes into account the cost of labor, materials, and equipment required for the project, as well as the need for compliance with utility company standards and stormwater pollution prevention measures. However, the exact budget amount cannot be determined without more specific information about the project's requirements and the bidding process.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Iowa City·Iowa

Top match · 64%

City Hall Fire Alarm Upgrade Project

Closes 11/3/2026Opened 10/7/2026

Idaho Transportation Department·Idaho

64% match

Key No. 23883 2ND STREET S SAFETY IMPROVEMENTS

Closes 11/3/2026Opened 10/10/2026

City of Cedar Rapids·Iowa

63% match

Kirkwood Boulevard SW from Rolling Ridge Drive to 66th Avenue Rehabilitation

Closes 11/4/2026Opened 10/21/2026

CUNY Baruch College·New York

63% match

CUNY Baruch College South Campus Boilers and Asbestos Abatement

Closes 11/3/2026Opened 10/7/2026

Idaho Transportation Department·Idaho

63% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

City of Pasadena·California

63% match

El Molino Avenue Demonstration Project

Closes 11/6/2026Opened 10/7/2026

City of Fort Wayne·Indiana

63% match

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

City of Indian Harbour Beach·Florida

63% match

Fire Protection Assessment Study

Closes 11/13/2026Opened 10/8/2026

School District of Philadelphia (Capital Opportunities)·Pennsylvania

63% match

FIRE ALARM SYSTEM REPLACEMENTATMASTERMAN SCHOOL1645 SPRING GARDEN STREETPHILADELPHIA, PA 19130

Closes 11/5/2026Opened 10/1/2026

Sterling Heights·Michigan

63% match

NORTH VAN DYKE AVENUE CORRIDOR IMPROVEMENTS & STORMWATER RESILIENCE PLANNING

Closes 11/10/2026Opened 9/30/2026

NYS PRIDE of Ticonderoga·New York

63% match

NYS CDBG Residential Rehabilitation Project

Closes 11/16/2026Opened 10/23/2026

MTA - NYC Transit (NYCT)·New York

62% match

ESS Jay Street-MetroTech and 207th Street Yard CCTV Wrap Up

Closes 11/19/2026Opened 10/13/2026

NYS Sleepy Hollow, Village of·New York

62% match

64-68 BEEKMAN AVENUE SITE CLEANUP PROJECT

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Defense·Illinois

62% match

Thomas J O Brien Lock and Dam Major Rehabilitation - Construction, Chicago, Cook County, Illinois

Closes 11/27/2026Opened 10/27/2026

City of Cincinnati·Ohio

62% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/6/2026Opened 9/10/2026

Southeastern Pennsylvania Transportation Authority·Pennsylvania

62% match

RRD West Chelten Ave. Surveillance Camera Improvement Project

Closes 11/2/2026Opened 10/23/2026

City of West Covina·California

62% match

Fire Station 123 Roof Replacement and Improvements Project

Closes 11/4/2026Opened 10/8/2026

Connecticut City of Norwich·Connecticut

62% match

Greeneille fire House Floor Repair

Closes 11/5/2026Opened 10/7/2026

City of Charlotte·North Carolina

62% match

Barrington Drive 5919 Storm Drainage Improvement Project

Rolling / TBD closeOpened 2/15/2027

California Department of Forestry and Fire Protection·California

62% match

9TSC0108-Fresno Air Attack Base Infrastructure Improvements

Closes 12/1/2026Opened 9/25/2026

NYS OGS Design & Construction - Construction Contractors·New York

62% match

Renovate Train Depot – Saranac Lake Train Depot (Project #47776)

Closes 12/2/2026Opened 10/20/2026

City of Charlotte·North Carolina

62% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

Municipality of Anchorage·Alaska

62% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Fort Wayne·Indiana

62% match

0890C - Eckart St Reconstruction: S Anthony Blvd to Winter St

Closes 11/12/2026Opened 10/29/2026

City of Charlotte·North Carolina

62% match

Wilkinson Boulevard Phase 3 Intelligent Transportation System (ITS)

Rolling / TBD closeOpened 2/1/2027