Wayne State University is seeking a qualified contractor to perform comprehensive maintenance and repair work on Parking Structure 7 located on the university campus. The scope includes extensive concrete repair (partial‑depth, full‑depth, slab‑on‑grade, curbs, walls, columns, and expansion joints), replacement of drainage components, mechanical and electrical allowances, traffic‑coating application, painting, and related specialty work such as bird‑deterrent installation and shear‑connector repairs. Work will be executed in two phases, with Phase 1 substantially completed by mid‑August 2026 and full project completion by mid‑August 2027. The contractor must meet strict prevailing‑wage (WSU wage schedule), bonding, insurance, and certification requirements, and must submit a single electronic bid package by May 12 2026.
• Concrete repair and structural rehabilitation of all damaged areas in the parking garage.
• Installation of new traffic‑topping systems, sealants, expansion‑joint assemblies, and repainting of traffic markings.
• Mechanical/electrical allowances, drainage upgrades, bird‑deterrent devices, and related specialty trades.
• Mandatory compliance with WSU prevailing‑wage rates, performance bonds (100 % of award), and comprehensive insurance coverage.
• Two‑phase schedule: Phase 1 substantial completion ≈ August 17 2026; Phase 2 substantial completion ≈ August 13 2027.