The Town of Flower Mound is accepting sealed bids for the reconstruction of Timber Valley Dr and Fairfield Ln. The project includes furnishing all labor, equipment, and materials for the reconstruction of the roads, sidewalks, water, and sewer. The bid must include all necessary connections, excavation, form work, concrete, reinforcing steel, lid and cover, testing, embedment material, backfill, and directly connected services. The bidder must also provide a Bid Bond in the amount of 5% of the total bid. The Town reserves the right to accept the lowest responsible bid or reject any or all bids.
• The project includes reconstruction of roads, sidewalks, water, and sewer
• The bidder must provide a Bid Bond in the amount of 5% of the total bid
• The Town reserves the right to accept the lowest responsible bid or reject any or all bids
• The project requires compliance with prevailing wage rates as defined by the United States Department of Labor
• The bidder must provide all necessary connections, excavation, form work, concrete, reinforcing steel, lid and cover, testing, embedment material, backfill, and directly connected services