Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Carolina guideNorth Carolina Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›North Carolina
  4. ›Construction
  5. ›Charging Station Install for GoDurham Battery Electric Buses

City of Durham·North Carolina

Charging Station Install for GoDurham Battery Electric Buses

Closes 9/30/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Durham is seeking a qualified contractor to design, construct, and commission charging infrastructure for its GoDurham battery‑electric bus fleet. The scope includes site preparation, erosion control, concrete washout facilities, traffic control, installation of heavy‑duty safety bollards, large pit pads for three‑phase transformers, multiple types of charging pads (Power Block, PowerLink, ChargePoint), full electrical conduit and wiring work, conduit installation (open trench and directional boring), conduit and conductor materials, termination of power and communication cables, and coordination with Duke Energy and other utilities. The contractor must manage all material storage, staging, delivery, and off‑site storage, comply with NCDOT and NCDENR erosion‑control standards, and adhere to NEC and manufacturer specifications. Payment will be on a unit‑price/lump‑sum basis for each item listed in the bid documents. • Location: Durham, NC (City of Durham Transportation Dept.) • Bid number 26‑1069, sealed bid opening 30 Sep 2026 at 1 PM • Closing date 30 Sep 2026 1 PM (same as opening) • Required deliverables: charging stations, transformer pads, switchboard pads, concrete washouts, erosion‑control measures, traffic control, electrical conduit, conductors, CAT‑6 communication cabling, terminations, utility coordination • Contractor responsible for all off‑site storage, staging, and material handling • Must comply with local, state, and federal environmental and safety regulations • No pre‑bid meeting or site‑visit listed; questions deadline not specified.

Attached files

Contact

Eric Simpson(Contact Person)

[email protected]

(919) 560-4366

Key dates

Opened
8/28/2026
Questions due
9/4/2026
Pre-bid meeting
9/30/2026
Closes
9/30/2026
Duration
120 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238210
Solicitation №
26-1069

Budget estimate

$2,000,000 – $5,000,000

The bid does not disclose a contract value. Based on comparable municipal EV‑bus charging projects (typically 10–15 charging stations, transformer pads, and extensive site work), a reasonable estimate ranges from $2 million for a minimal installation to $5 million for a full‑scale deployment with multiple pad types and extensive utility coordination. Factors influencing the final amount include the number of charging units, site conditions, required erosion‑control measures, and the extent of utility relocation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Department of Education·South Carolina

Top match · 73%

Electric Bus Charging Stations - Colleton - Paving

Closes 11/10/2026Opened 10/19/2026

SC Department of Education·South Carolina

71% match

Electric Bus Charging Stations - Union - Electrical

Closes 11/5/2026Opened 10/13/2026

Connecticut Energy & Environmental Protection·Connecticut

71% match

Electric Vehicle Charging Station Upgrades

Closes 11/13/2026Opened 10/23/2026

SC Department of Education·South Carolina

70% match

Electric Bus Charging Stations - Colleton - Electrical

Closes 11/10/2026Opened 10/19/2026

SC Department of Education·South Carolina

70% match

Electric Bus Charging Stations - Newberry - Electrical

Closes 11/5/2026Opened 10/13/2026

SC Department of Education·South Carolina

69% match

Electric Bus Charging Stations - Newberry - Paving

Closes 11/5/2026Opened 10/13/2026

SC Department of Education·South Carolina

68% match

Electric Bus Charging Stations - Chesterfield - Electrical

Closes 11/10/2026Opened 10/13/2026

Department of Education·South Carolina

68% match

Electric Bus Charging Stations - Union - Paving

Closes 11/5/2026Opened 10/12/2026

Massachusetts Department of Transportation·Massachusetts

67% match

613689 CAMBRIDGE FAP No. HPP/STP-003E(014)X Neighborhood Electric Vehicle Charging Infrastructure

Closes 11/10/2026Opened 9/14/2026

City of Tamarac·Florida

67% match

EV CHARGING STATION INFRASTRUCTURE- DC FAST CHARGING STATIONS

Closes 11/17/2026Opened 10/15/2026

Kansas City Area Transportation Authority·Missouri

66% match

Design-Build Battery Electric Bus (BEB) Charging Infrastructure and Canopy

Closes 12/29/2026Opened 11/16/2026

SC Department of Education·South Carolina

66% match

Electric Bus Charging Stations - Chesterfield - Paving

Closes 11/10/2026Opened 10/14/2026

Lee County·Florida

66% match

Installation of Two ChargePoint Electric Bus Chargers

Closes 11/3/2026Opened 10/2/2026

Maryland Department Of General Services·Maryland

66% match

Installing 10 Single-Port 48A Level 2 and 2 Level 3 80 kW DC Fast Chargers at Maryland Correctional Transportation Unit

Closes 11/9/2026Opened 10/17/2026

NYS Capital District Transportation Authority·New York

66% match

Batteries for Transit Buses

Closes 11/10/2026Opened 10/15/2026