The City of Mobile’s Municipal Enforcement Department is seeking a contractor to perform full‑wet demolition and nuisance abatement of all structures on the 1314 Pecan Street parcel, including footings, slabs, and CMU piers, followed by utility disconnection, debris removal, erosion‑ and sediment‑control, hazardous‑material handling, site seeding, and final close‑out documentation. The work must be completed within 30 calendar days of the Notice to Proceed and includes strict environmental BMPs for lead‑based paint and asbestos, as well as required photographic and waste‑shipment records.
• Wet‑method demolition of all existing wood‑frame structures, footings, slabs, and masonry.
• Disconnect, cap, and verify sanitary sewer, water, and gas lines per agency standards.
• Remove all demolition debris, manage hazardous waste, install temporary BMPs, and provide permanent site stabilization (seeding, top‑soil, mulch).
• Submit before/after photos, waste shipment records, AIA close‑out forms, and a newspaper notice of final completion.