Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Georgia guideGeorgia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Georgia
  4. ›Construction
  5. ›W Main St Pedestrian Corridor

Georgia City of Canton·Georgia

W Main St Pedestrian Corridor

Closes 5/7/2026$750k – $1.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Canton is seeking bids for the W Main St Pedestrian Corridor project. The project involves converting the existing two-way roadway to one-way with on-street angled parking, roadway widening and overlay, installation of a 10' wide concrete sidewalk with brick pavers, and other improvements. The project includes construction of driveways, storm drain installation, signing and pavement markings, landscaping, and streetscaping. The contractor will be responsible for maintaining traffic control during construction and ensuring positive drainage of all planting holes and plant beds. • Conversion of the existing two-way roadway to one-way with on-street angled parking • Roadway widening and overlay • Installation of a 10' wide concrete sidewalk with brick pavers • Driveway reconstruction and traffic control throughout construction • Storm drain installation • Signing and pavement markings • Landscaping and streetscaping • Site grading and stabilization of disturbed areas with temporary and permanent erosion control measures • Water and sewer main and service installation • Coordination of overhead to underground utility conversion and lighting installation

Attached files

Contact

Bethany Watson(Buyer Contact)

[email protected]

(770) 704-1521

Key dates

Opened
4/2/2026
Closes
5/7/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PE-66114-NONST-2026-000000034

Budget estimate

$750,000 – $1,500,000

The budget for this project can be estimated based on the scope of work, which includes construction of a pedestrian corridor, sidewalk installation, and landscaping. The cost of similar projects in the area can range from $500,000 to $2,000,000. Considering the project's complexity and the materials required, a reasonable estimate for the budget would be between $750,000 and $1,500,000. Factors that may influence the likely payment range include the cost of materials, labor costs, and the complexity of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Richmond Government·Virginia

Top match · 60%

VDOT IFB #270004813 - US 60Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/1/2026Opened 10/23/2026

City of Charlotte·North Carolina

58% match

Harrisburg Road Shared Use Paths (SUPs)

Rolling / TBD closeOpened 2/23/2026

City of Charlotte·North Carolina

58% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

LA Public Works Engineering Bureau·California

58% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

Georgia City of College Park·Georgia

58% match

MAIN STREET STREETSCAPE IMPROVEMENTS

Closes 11/10/2026Opened 10/28/2026

City of Seattle·Washington

58% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

Maryland State Highway Administration·Maryland

58% match

HO5415179 - US 1 (Washington Boulevard) from MD 979 (Main Street) to Gorman Road Pedestrian Safety Action Plan

Closes 11/24/2026Opened 10/20/2026

City of Sacramento·California

58% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

City of Charlotte·North Carolina

57% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

Louisiana Recreation and Park Commission for the Parish of East Baton Rouge·Louisiana

57% match

Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 11/3/2026Opened 9/30/2026

NYS East Fishkill, Town of·New York

57% match

RT 52 Pedestrian and Intersection Improvements

Closes 11/13/2026Opened 10/19/2026

Town of Bluffton·South Carolina

57% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

Missouri Department of Transportation·Missouri

57% match

NW District, City of Maryville, South Main Trail Connection Project

Closes 11/11/2026Opened 10/2/2026

City of Hampton·Virginia

56% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

U.S. Department Of Transportation·Hawaii

56% match

HI FLAP CR562(1) Kilauea Point

Closes 11/15/2026Opened 10/15/2026

Division of Highways·North Carolina

56% match

U.S. Highway 17 Pedestrian Crossing

Closes 11/19/2026Opened 10/27/2026

City of Richmond·Virginia

56% match

US 60 Downtown Expressway Gateway Pedestrian Improvements (UPC#111702)

Closes 12/2/2026Opened 10/23/2026

City of Ontario·California

56% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Harrisonburg·Virginia

56% match

Northend Greenway (NEG) Brookside ITB (2027020-PW-B)

Closes 12/10/2026Opened 10/22/2026

Virginia Department of Transportation·Virginia

56% match

B33_2027 PEDESTRIAN SAFETY IMPROVEMENTS

Closes 11/18/2026Opened 10/13/2026

Miami-Dade County·Florida

56% match

SRTS Miami Northwestern Senior High School FM 445766-1

Closes 11/4/2026Opened 10/2/2026

City of Frazee, MN·Minnesota

56% match

2026 Sanitary Lift Station Improvements - Main Ave E & 2nd Street SW

Closes 11/18/2026Opened 10/16/2026

City of Ormond Beach - Purchasing Office·Florida

56% match

Main Trail Bridge Repair

Closes 11/6/2026Opened 9/27/2026

Charleston County·South Carolina

56% match

Road Work - Riverland Drive (S-53) Pedestrian Improvements & Central Park Road (S-67) Roadway Improvements

Closes 12/1/2026Opened 10/30/2026

Minnesota Department of Administration·Minnesota

56% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026