The Town of Pine Mountain is seeking bids for the Sullivan Circle Drainage Improvements project. The project involves the demolition of existing storm pipes and structures, regrading of ditches, and installation of new storm sewer pipes and structures. The project also includes traffic control, erosion sedimentation, and pollution control installation and maintenance. The successful bidder will be required to perform work as the prime contractor, with a minimum of 30% of the contract value. The project is expected to be completed within 90 consecutive calendar days from the date of a written "Notice to Proceed" from the owner. Key elements of the project include:
• Demolition of 87 LF of 15” CMP pipes and structures
• Sawcut and remove/replace 45 square yards of asphalt roadway
• Sawcut and remove/replace of 61 square yards of concrete driveway
• Abandonment of +/- 60 LF of 12 inch and 15-inch CMP storm sewer pipes
• Installation of 282 LF of 15-inch RCP, 65 LF of 18-inch RCP, and 63 LF of 24-inch RCP storm sewer pipes and structures
• Grading needed for ditches, swales, and tie-in slope
• Installation of permanent grassing and sod in certain areas