Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›PERISHABLE TOOLING FOR OUTER WING PANEL (OWP) AILERON…

U.S. Department Of Defense·New Jersey

PERISHABLE TOOLING FOR OUTER WING PANEL (OWP) AILERON HINGE REPLACEMENTS

Closes 10/13/2026$100k – $500kRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Navy’s Naval Air Warfare Center Aircraft Division is seeking industry input on perishable tooling needed for the replacement of outer‑wing‑panel aileron hinges on F/A‑18E/F and EA‑18G aircraft. This is a Sources Sought/RFI to collect technical solutions, existing or near‑term products, and recommendations for improving the tooling, with responses limited to ten pages and due within five business days. The solicitation does not constitute a solicitation for proposals, nor will the government award a contract based on this RFI. • Goal: Identify existing tooling or near‑term concepts that can meet performance requirements for OWP aileron hinge replacements. • Response requirements: Provide company admin data, describe existing or developing products, give recommendations, and list any clarifying questions. • Submission method: Email response to the primary point of contact by the deadline; no cost to respondents; proprietary information will be protected.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Heavens Kelly

[email protected]

Key dates

Opened
10/6/2026
Closes
10/13/2026

Last updated

Details

Type
Request for Information
Industry
Aerospace and Defense
NAICS
333515
Solicitation №
N68335-27-RFI-1003

Budget estimate

$100,000 – $500,000

No monetary value is disclosed; however, typical tooling development for a niche aerospace application can range from a low‑hundred‑thousand dollars for a prototype to several hundred thousand dollars for a small production run. Assuming design, testing, and limited manufacturing, an estimate of $100,000‑$500,000 is reasonable. Factors influencing the range include the complexity of the tool, required material certifications, and the volume of hinges to be produced.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·New Jersey

Top match · 91%

PERISHABLE TOOLING FOR OUTER WING PANEL (OWP) AILERON HINGE REPLACEMENTS

Closes 11/19/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

73% match

53--LEAF,BUTT HINGE

Closes 11/30/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

71% match

15--SPOILER,WING,AIRCRA, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/22/2026

U.S. Department Of Defense·California

70% match

15--SPOILER,WING,AIRCRA, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

70% match

15--SPOILER,WING,AIRCRA, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/22/2026

U.S. Department Of Homeland Security·United States of America

69% match

Overhaul of Rotary Wing and Rotary Rudder Blades

Closes 11/30/2026Opened 7/14/2026

U.S. Department Of Defense·California

69% match

15--SPOILER,WING,AIRCRA, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

69% match

14--PANEL,STRUCTURAL,AI - AND OTHER REPLACEMENT PARTS

Closes 11/6/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

69% match

16--FRAME,SEAT,AIRCRAFT, IN REPAIR/MODIFICATION OF

Closes 12/6/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

69% match

53--LEAF,BUTT HINGE

Closes 11/30/2026Opened 10/23/2026

U.S. Department Of Defense·Oklahoma

69% match

53--LEAF,BUTT HINGE

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·New Jersey

68% match

BRACE, AIRCRAFT GROUND SERVICING

Closes 11/19/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

68% match

FD2030-27-00218

Closes 9/3/2027Opened 9/3/2026

U.S. Department Of Defense·United States of America

68% match

16--NRP,SPOILER ASSY -, IN REPAIR/MODIFICATION OF

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Homeland Security·North Carolina

68% match

Overhaul of Rotary Wing and Rotary Rudder Blades

Closes 11/30/2026Opened 4/13/2026

U.S. Department Of Defense·Oklahoma

68% match

P&W Tooling Evaluation and Repair

Closes 11/4/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

68% match

FIXTURE,AIRCRAFT MA

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Homeland Security·North Carolina

68% match

Overhaul of the Wheels, Brakes and associated components to support the HC-144 and HC-27J Aircraft

Closes 11/20/2026Opened 9/24/2026

U.S. Department Of Defense·United States of America

68% match

16--WHEEL HALF,AIRCRAFT, IN REPAIR/MODIFICATION OF

Closes 11/19/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

68% match

17--SLING,AIRCRAFT MAIN, IN REPAIR/MODIFICATION OF

Closes 4/5/2027Opened 9/17/2026

U.S. Department Of Defense·United States of America

68% match

28--BLADE SET,FAN,AIRCR, IN REPAIR/MODIFICATION OF

Closes 11/13/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

68% match

PANEL ASSEMBLY,KEY

Closes 11/17/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

68% match

16--FRAME,SEAT,AIRCRAFT, IN REPAIR/MODIFICATION OF

Closes 11/28/2026Opened 10/27/2026

U.S. Department Of Defense·Pennsylvania

68% match

CONTROL PANEL,AIRCR

Closes 12/9/2026Opened 9/10/2026

U.S. Department Of Defense·United States of America

68% match

16--BLADE ASSEMBLY,MAIN, IN REPAIR/MODIFICATION OF

Closes 11/2/2026Opened 10/19/2026