Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Engineering Services
  5. ›Surveying, Drafting, and Design Services for the…

Lansing Board of Water & Light·Michigan

Surveying, Drafting, and Design Services for the Installation of Water Main at Multiple Locations

Closes 10/22/2026$500k – $2MRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Lansing Board of Water and Light (BWL) seeks a qualified consulting firm to provide comprehensive surveying, base mapping, design, permitting, geotechnical, and construction‑engineering services for the replacement and installation of multiple water mains throughout the city. The scope covers topographic surveys, detailed design drawings (including plans, profiles, traffic and erosion control), permit acquisition, core sampling and geotechnical analysis, construction‑phase engineering support, and final as‑built documentation. The consultant must submit phased design deliverables (50%, 75%, 95%, and final), three budgetary design scenarios per segment, and a full fee proposal with a not‑to‑exceed cap. The work must be completed by mid‑January 2027 for design tasks, with construction engineering to begin in spring 2027. • Mandatory pre‑bid meeting 10/14/2026 (in‑person or virtual). • Surveying of existing utilities, curb lines, and right‑of‑way conditions. • Design of 8‑inch and 6‑inch ductile‑iron water mains, hydrants, valves, and service tie‑ins across three street segments. • Preparation of construction‑ready plans at 1" = 40' scale, including traffic, erosion, and environmental controls. • Permit assistance and coordination with City of Lansing and state agencies. • Geotechnical coring, soil classification, and reporting. • Construction‑phase engineering, inspection, CCTV, and final punch‑list. • Fee proposal based on actual cost plus overhead/profit, with required insurance.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Ali Abdul-Wahab(Purchasing Department)

[email protected]

(517) 702-6941

Key dates

Opened
9/29/2026
Questions due
10/16/2026
Pre-bid meeting
10/14/2026Mandatory
Closes
10/22/2026
Duration
6 months

Last updated

Details

Type
Request for Proposal
Industry
Engineering Services
NAICS
541330
Solicitation №
202609230001 Addendum 1

Budget estimate

$500,000 – $2,000,000

The RFP does not disclose a total contract value. Based on the scope (multiple water‑main segments, detailed design, geotechnical work, and construction‑phase engineering) and typical municipal water‑main design fees in Michigan (approximately $150–$250 per linear foot for design and $300–$500 per linear foot for combined design‑plus‑construction support), a reasonable estimate ranges from about $500,000 for a minimal design effort to $2,000,000 for a full‑service, multi‑segment engagement. Factors influencing the final amount include the chosen construction method (open‑cut vs. directional drilling), the number of design scenarios submitted, and any additional geotechnical or environmental studies required.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lansing Board of Water & Light·Michigan

Top match · 84%

Surveying, Drafting, and Design Services for the Installation of Water Main at Multiple Locations (Dunlap, Astor, Berry, Palmer, Tenny

Closes 11/24/2026Opened 10/23/2026

KC Board of Public Utilities·Kansas

78% match

Surveying and Services

Closes 11/4/2026Opened 9/25/2026

Florida Governmental Utility Authority·Florida

77% match

Meadow Road and 28th St. Water Main Extension

Closes 11/24/2026Opened 10/19/2026

Village of Wilmette·Illinois

77% match

2027 Water Main Replacement Construction Engineering Services

Closes 11/4/2026Opened 10/15/2026

County of Moore·North Carolina

76% match

Engineering Services - East Moore Water District Phase 5 Water Main Extension

Closes 11/12/2026Opened 10/22/2026

City of Farmers Branch·Texas

76% match

Waterline Replacement Engineering Design

Closes 11/3/2026Opened 10/1/2026

City of DeLand·Florida

75% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

New York City Department of Design and Construction·New York

75% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/24/2025

City of Ontario·California

75% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

City of Edgewater, FL·Florida

75% match

Silver Ridge Water Main Replacement

Closes 11/10/2026Opened 10/8/2026

New York City Department of Design and Construction·New York

75% match

Emergency Water Main Work

Rolling / TBD closeOpened 4/27/2026

Maryland Mayor and Town Council of Oakland·Maryland

75% match

PROFESSIONAL ENGINEERING SERVICES OAKLAND WATER SYSTEM COMPREHENSIVE ENGINEERING & INFRASTRUCTURE PLAN, PHASE I

Closes 11/9/2026Opened 10/9/2026

City of Lake City and City of Bellechester·Minnesota

74% match

Lake City & Bellechester Lead Service Line Replacement Project

Closes 12/8/2026Opened 10/16/2026

South Tahoe Public Utility District·California

74% match

Engineering Services for Water System and Sewer Collection System Strategic Plans

Closes 12/11/2026Opened 10/27/2026

Hastings Utilities·Nebraska

74% match

Water Main Relocation St Joseph Ave from 7th to 8th Street HU 2026-43

Rolling / TBD closeOpened 5/4/2026

City of Grand Rapids Department of Engineering·Michigan

74% match

Water Main and Water Main Lining, Adams Street – City of Grand Rapids

Closes 11/3/2026Opened 10/15/2026

Town of Lexington·South Carolina

74% match

SERVICES FOR POTABLE WATER SYSTEM HYDRAULIC MODELING AND PROGRAM MANAGEMENT

Closes 11/5/2026Opened 9/16/2026

New Mexico General Services Department·New Mexico

74% match

INSTALLATION AND SERVICE OF WATER SYSTEMS

Closes 11/10/2026Opened 10/1/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

74% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

New York City Department of Design and Construction·New York

74% match

EMERGENCY WATER MAINS

Rolling / TBD closeOpened 3/12/2021

City of McCook·Nebraska

74% match

South 3rd Street Water System Improvements

Closes 11/10/2026Opened 10/21/2026

Arkansas

73% match

Bid Water Main and Stabilization

Rolling / TBD closeOpened 10/18/2026

City of Dermott·Arkansas

73% match

Notice of Request for Qualifications for Engineering Services

Closes 11/2/2026Opened 10/18/2026

U.S. Department Of Agriculture·Utah

73% match

Ross Springs Waterline Replacement

Closes 11/21/2026Opened 10/22/2026

NYS Dutchess County Water and Wastewater Authority·New York

73% match

Quaker Hill-Hyde Park Interconnect-Water Main & Pump Station

Closes 11/25/2026Opened 10/20/2026