The US Coast Guard is soliciting a contractor to provide all necessary facilities, materials, equipment, and personnel to perform dockside repairs and maintenance to the USCGC SPENCER (WMEC-905). The required period of performance is from 31 August 2026 to 25 October 2026. The contractor will be responsible for performing various work items, including seawater heat exchangers, chill water system, potable water pneumatic tanks, sewage discharge and transfer pumps, grey water holding tanks, sewage holding tanks, sewage piping, and temporary services. The contractor must also provide a qualified team to perform the work, including a project manager, engineers, and technicians. The contractor will be required to work closely with Coast Guard personnel to ensure that all work is completed safely and efficiently.
Some key work items include:
• Seawater heat exchangers, clean, inspect, and hydro
• Chill water system, clean and flush
• Potable water pneumatic tanks, clean and inspect
• Sewage discharge and transfer pumps, renew
• Grey water holding tanks, clean and inspect
• Sewage holding tanks, clean and inspect
• Sewage piping, clean and flush
• Temporary services, heating and cooling