The project entails constructing a roughly one‑mile, 10‑ft‑wide multi‑use greenway trail in St. Louis County, Missouri, linking Eskridge High School to St. Charles Rock Road. The scope includes full‑depth paving (asphalt and concrete), grading, drainage, storm‑sewer upgrades, curb‑gutter installation, parking stalls, tree removal and protection, extensive lighting (pole‑mounted LED fixtures, solar lighting, basketball‑court lighting), signage, landscaping, utility relocations, and associated site work. The contractor must provide a 5 % bid bond, 100 % performance/payment bonds, and comply with prevailing‑wage, E‑Verify, and anti‑discrimination certifications.
• Civil construction: earthwork, base aggregate, asphalt/concrete pavement, curbs, drains, storm‑sewer pipe and inlets.
• Electrical & lighting: installation of LED luminaires, concrete pole bases, conduit, and emergency Code‑Blue phones.
• Landscape & signage: tree protection fencing, planting of trees/shrubs/grass, way‑finding and regulatory signs.
• Utility coordination: relocation of Ameren, AT&T, water, and other underground services.
• Compliance: ADA accessibility, MS‑DOT and MSD standards, flood‑plain requirements, and environmental permits.