Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New York guideNew York Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New York
  4. ›Waste Removal and Collection
  5. ›Colorado Avenue – CSO053 SPP 337 Modification

NYS Buffalo Sewer Authority·New York

Colorado Avenue – CSO053 SPP 337 Modification

Closes 7/9/2026$1M – $5MInvitation for BidLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Kandey Company, Inc. is requesting NYS certified MWBE subcontractor and supplier participation for the Colorado Avenue – CSO053 SPP 337 Modification project in Erie County, NY for all scopes detailed in the contract documents. Description: The Work includes, but is not limited to, the following:1. Extension of SPP 337 Diversion Chamber along the south and east sides of the existing SPP.2. Installation of a new dropshaft to the Scajaquada Tunnel, including energy dissipation insert, and connection to the existing dropshaft and stub pipe to the Scajaquada Tunnel.3. Installation of new 42-inch diameter piping from the dropshaft to the existing SPP 337 dropshaft.4. Modification of the existing SPP337 interceptor chamber to connect to the proposed SPP 337 Diversion Chamber.5. Conversion of existing dropshaft to the Scajaquada Tunnel into a new air vent shaft.6. Installation of temporary access road to facilitate entry to the existing industrial site adjacent to the Work area.7. Restoration of work zone area, including landscaping, paving, curb replacement, sidewalk replacement as shown and specified. C. The Work further includes:1. Furnishing labor, material, superintendence, power, light, heat, fuel, water, tools, appliances, equipment, supplies, services and other means of construction necessary or proper for performing and completing the Work2. Maintaining the Work area and site in a clean and acceptable manner3. Protection of finishing and unfinished Work4. Furnishing proper equipment and machinery, of a sufficient capacity, to facilitate Work and to handle issues normally encountered in Work of this character.5. Furnishing, installing and protecting necessary supports, anchor and attachment bolts, and other appurtenances needed for the installation of the Work.6. Control of local traffic during construction.The Work is located in the City of Buffalo, in Erie County, New York at the intersection of Colorado Avenue and Scajaquada Street. Contract documents can be obtained through the Construction Exchange website or by contacting estimator Richard Szucs ([email protected]) Service-Disabled Veteran-Owned Business (SDVOB) SDVOB Goal: 0.00% Minority / Women Business Enterprise contracting goals (MWBE) Total MWBE Goals: 20.00% Disadvantaged Business Enterprise contracting goals (DBE) DBE Goal: 0.00%

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Richard Szucs(Estimator)

[email protected]

(716) 675-7245

Key dates

Opened
6/11/2026
Closes
7/9/2026

Last updated

Details

Type
Invitation for Bid
Industry
Utilities and Waste Management
NAICS
237110
Solicitation №
2136117

Budget estimate

$1,000,000 – $5,000,000

The budget for this opportunity is estimated to be between $1 million and $5 million. This estimate is based on the scope of the project, which involves the extension of the SPP 337 Diversion Chamber, installation of a new dropshaft, and modification of the existing SPP337 interceptor chamber. The project also includes furnishing labor, material, and equipment necessary for performing and completing the work. The total MWBE goal for this project is 20.00%, which may also impact the budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Cerritos·California

Top match · 66%

CDBG-Funded curb ramp/sidewalk repairs at Cerritos Towne Center Phase IV (CDBG Project No. 602800-26), Project No. 24302

Closes 11/18/2026Opened 10/23/2026

City of Coronado·California

65% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Philadelphia·Pennsylvania

65% match

PW Bid 3993ECMS - MPMS 82199 Cottman Ave Redesign with GSI

Closes 12/3/2026Opened 10/16/2026

Columbus State Community College·Ohio

65% match

CSCC WD-1 Annex Major Renovation

Closes 11/10/2026Opened 10/20/2026

U.S. Department Of Transportation·Colorado

65% match

CO BR UCPO Blue Mesa Road(1) Blue Mesa Road

Closes 12/1/2026Opened 10/27/2026

LA Public Works Engineering Bureau·California

65% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

NYS OGS Design & Construction - Construction Contractors·New York

65% match

45298 HVAC – Alterations and Improvements, Building No. 75

Closes 12/2/2026Opened 10/20/2026

City of Culver City·California

65% match

Minor Pavement & Concrete Improvement Project (PZ-554) and Ocean Drive Sidewalk Project (PS-037)

Closes 11/19/2026Opened 10/29/2026

The City of Anaheim·California

65% match

Katella Ave & State College Blvd Rehabilitation Project

Closes 11/5/2026Opened 10/15/2026

Nyc Department of Design and Construction·New York

64% match

85027B0025 - HWCB27QXM: REPLACEMENT OF CONCRETE, STEEL FACED AND GRANITE CURBS AND RELATED SIDEWALK AND ROADWAY RESTORATION

Closes 11/23/2026Opened 10/30/2026

City of Cincinnati·Ohio

64% match

Hopple Street HAM CR 163 5.5 - PID 121735

Closes 11/6/2026Opened 9/10/2026

City of Shawnee·Kansas

64% match

Ordinance No. 3494

Closes 7/16/2031Opened 7/16/2024

State of Colorado·Colorado

64% match

IH-25043/ State Parking Garage Single Entrance Remodel-1350

Closes 11/6/2026Opened 10/28/2026

City of El Paso·Texas

64% match

Pebble Hills Regional Command Center Renovation

Closes 11/18/2026Opened 10/20/2026

City of Vernon·California

64% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

State of Colorado Capital Complex·Colorado

64% match

IH-25043/ State Parking Garage Single Entrance Remodel-1350

Closes 11/6/2026Opened 10/30/2026

City of Shawnee·Kansas

64% match

Ordinance No. 3482

Closes 1/30/2030Opened 1/30/2024

Idaho Transportation Department·Idaho

64% match

Key No. 13905 N 10TH AVE ITS & OVERLAY

Closes 11/17/2026Opened 10/10/2026

Miami-Dade County Department of Transportation and Public Works·Florida

64% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

Colorado Pueblo Community College·Colorado

64% match

ADA Upgrades

Closes 12/3/2026Opened 10/30/2026

Municipality of Anchorage·Alaska

64% match

4th Avenue Reconstruction – G Street to E Street (Project 21‑22)

Closes 11/4/2026Opened 10/7/2026

City of Shawnee·Kansas

64% match

Ordinance No. 3518

Closes 3/4/2031Opened 3/4/2025

City of Fargo·North Dakota

64% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Indianapolis·Indiana

64% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Shawnee·Kansas

63% match

Ordinance No. 3499

Closes 8/20/2029Opened 8/20/2024