Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Mississippi River, Baton Rouge to Gulf of Mexico…

U.S. Department Of Defense·Louisiana

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutter head Dredge No 3-2024 OM-24-277

Closes 4/21/2026$10M – $25MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers, New Orleans District, is soliciting bids for the maintenance dredging of the Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, using a cutterhead dredge. The work consists of furnishing one fully crewed and equipped cutterhead dredge, with a dredge discharge size of 30 inches or greater inside diameter, complete in all respects, including all attendant plant, and crew. The project duration is approximately 52 days, and the contractor shall begin performance within 15 calendar days after issuance of the Notice to Proceed. The bid schedule includes items for mobilization and demobilization, dredging, and option dredging. The government may award the contract at the total bid price, comprised of the base items and option item(s), but is not obligated to exercise any option item(s). Key points to consider: • The project requires a cutterhead dredge with a discharge size of 30 inches or greater inside diameter. • The project duration is approximately 52 days. • The contractor shall begin performance within 15 calendar days after issuance of the Notice to Proceed. • The bid schedule includes items for mobilization and demobilization, dredging, and option dredging. • The government may award the contract at the total bid price, comprised of the base items and option item(s), but is not obligated to exercise any option item(s).

Attached files

Contact

Melissa A. Vaughn(Contract Specialist)

[email protected]

(504) 862-2762

Key dates

Opened
2/2/2024
Closes
4/21/2026
Duration
52 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237990
Solicitation №
W912P824B0009

Budget estimate

$10,000,000 – $25,000,000

The budget for this project is estimated to be between $10,000,000 and $25,000,000, as stated in the solicitation. This estimate is based on the project's requirements, including the use of a cutterhead dredge and the project duration of approximately 52 days. The actual budget may vary depending on the bidder's proposal and the government's evaluation of the bids.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Louisiana

Top match · 88%

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

88% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

88% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

88% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

88% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 4-2025 (OM25278)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

87% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 4/27/2026

U.S. Department Of Defense·Louisiana

87% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

87% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

87% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

87% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

87% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

86% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

84% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 6-2025 (OM25006)

Closes 3/23/2027Opened 3/26/2025

U.S. Department Of Defense·Louisiana

83% match

Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 2-2025. Specification No. OM25136

Closes 7/21/2027Opened 5/12/2025

U.S. Department Of Defense·Louisiana

83% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

82% match

Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 3-2025. Specification No. OM25137

Closes 7/21/2027Opened 5/12/2025

U.S. Department Of Defense·Louisiana

82% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

82% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 7-2025 (OM25007)

Closes 3/23/2027Opened 3/25/2025

U.S. Department Of Defense·Louisiana

82% match

Mississippi River, New Orleans Harbor And Various Bar Channels Cutterhead No 4-2025

Closes 3/18/2028Opened 3/18/2026

U.S. Department Of Defense·Louisiana

82% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 9-2025 (OM25009)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

81% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract Nos. 10-2025 (OM25010)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

81% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 4-2025 (OM25004)

Closes 3/23/2027Opened 2/4/2025

U.S. Department Of Defense·Louisiana

81% match

Mississippi River, New Orleans Harbor Cutterhead Dredge No. 1-2025

Closes 4/21/2027Opened 4/22/2025

U.S. Department Of Defense·Louisiana

81% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 9-2026 (OM26009)

Closes 5/7/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

81% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 2-2026 (OM26002)

Closes 5/7/2028Opened 4/15/2026