Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Laydown Site Preparation Project - Karup, Denmark…

U.S. Department Of Defense·U.S. Armed Forces – Europe

Laydown Site Preparation Project - Karup, Denmark (Horizontal Construction)

Closes 4/8/2026$1M – $5MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers (USACE) Europe District is planning a requirement for a firm-fixed-price, design-bid-build construction contract to build a new Deployable Airbase System (DABS) with facilities, equipment, and vehicles (FEV) laydown site in Karup, Denmark. The project includes construction of a new laydown area with concrete tent pads, gravel bed, site improvements, and utility connections. The project's anticipated magnitude of construction is between $1,000,000 and $5,000,000. • The project requires construction of a new laydown area with concrete tent pads, gravel bed, site improvements, and utility connections. • The project includes site development, utilities, and connections (electrical power, domestic water & wastewater), and storm drainage. • The project requires accommodation of BEAR assets, including 72 billet shelters, two latrine shelters, two shower shelters, one laundry shelter, one 550-person kitchen package, four command operations shelters, and three morale, welfare, and recreation shelters. • The project requires supporting facilities, including site development, utilities, and connections (electrical power, domestic water & wastewater), and storm drainage.

Attached files

Contact

Adam Shevock(Contract Specialist)

[email protected]

Key dates

Opened
3/23/2026
Pre-bid meeting
6/1/2026
Site visit
6/1/2026
Closes
4/8/2026
Projected award
10/1/2026
Duration
365 days

Last updated

Details

Type
Sole Source
Industry
Construction
NAICS
238910
Solicitation №
W912GB26X1AT4

Budget estimate

$1,000,000 – $5,000,000

The budget for this project can be estimated based on the anticipated magnitude of construction, which is between $1,000,000 and $5,000,000. Considering the scope of work, including site preparation, construction of concrete tent pads, gravel bed, and utility connections, the budget is likely to be closer to the higher end of the range. Factors that may influence the likely payment range include the complexity of the project, the location, and the contractor's experience and qualifications.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Delta Airport Consultants·Virginia

Top match · 69%

COMING SOON - Winchester, VA - Winchester Regional Airport - Northside Site Preparation (25023)

Rolling / TBD closeOpened 6/1/2026

U.S. Department Of State·United States of America

68% match

Trenching, Conduit and Ground-well Installation

Closes 11/25/2026Opened 10/28/2026

Quonset Development Corporation·Rhode Island

67% match

RI Fast Ferry Site Work - Construction

Closes 11/17/2026Opened 10/28/2026

Delta Airport Consultants·Virginia

67% match

COMING SOON - Rural Retreat, VA - Mtn. Empire Ap. - Construct Taxilane and Hangar Sites (23038)

Rolling / TBD closeOpened 4/1/2026

Department of Parks, Recreation and Tourism·South Carolina

67% match

Golf Course Cart Path Paving-Hickory Knob State Resort Park

Closes 11/11/2026Opened 10/14/2026

U.S. Department Of Defense·Utah

67% match

Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance

Closes 11/18/2026Opened 10/14/2026

Confederated Tribes of the Colville Reservation·Washington

67% match

Traditional Territories Program, Concrete Slab Construction – Omak Fish and Wildlife Bullpen (Saint Mary’s Mission Campus)

Closes 11/26/2026Opened 10/23/2026

U.S. Department Of Defense·Oklahoma

67% match

Vehicle Maintenance Shop, Kadena Air Base, Okinawa, Japan

Closes 2/15/2027Opened 10/14/2026

U.S. Department Of Defense·Pennsylvania

67% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

Delaware Coastal Airport·Delaware

67% match

COMING SOON - Georgetown, DE - Delaware Coastal Airport - Construct Taxiway B - Bid Pkg. 3 (25031)

Rolling / TBD closeOpened 10/22/2026

U.S. Department Of Defense·Nebraska

66% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 9/22/2027Opened 9/22/2026

North Dakota Public Service Commission·North Dakota

66% match

Cartwright AML Project; 408.26.10.006

Closes 11/17/2026Opened 10/19/2026

Minnesota Department of Natural Resources·Minnesota

66% match

State Fair Fire Prevention Building Drainage Correction

Closes 11/17/2026Opened 10/29/2026

Department of Natural Resources·South Carolina

66% match

Charleston-Fort Johnson Boat Slip Renovation - Spoil Site Repair and Dredge

Closes 11/5/2026Opened 10/7/2026

Virgin Islands Port Authority·U.S. Virgin Islands

66% match

STX)-2027-01 (Parking Lot Resurfacing Project- Henry E Rohlsen Airport, ST. Thomas

Closes 12/2/2026Opened 10/22/2026

Delta Airport Consultants·Virginia

66% match

Wise, VA - Lonesome Pine Airport - Construct SRE Building and Site Work

Rolling / TBD closeOpened 10/22/2026

Connecticut Town of Hamden·Connecticut

66% match

Hamden Walkable Sidewalks DOT 61-153

Closes 12/10/2026Opened 10/27/2026

City of Hanska·Minnesota

66% match

Hanska City 100,000‑Gallon Elevated Water Storage Tank Construction

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Defense·Louisiana

66% match

Instrument Landing Structure (ILS)

Closes 11/2/2026Opened 10/16/2026