Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFIRFI Meaning: What Is an RFI?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Instrument Landing Structure (ILS)

U.S. Department Of Defense·Louisiana

Instrument Landing Structure (ILS)

Closes tomorrow$7.8M – $9.5MRequest for Information
Get bids like this by emailBid source

Description

The U.S. Army Corps of Engineers is conducting a Sources Sought market survey for site‑preparation and construction services needed to install an unmanned Instrument Landing System (ILS) at Fort Polk, LA. The work will involve demolition, utility rerouting, new utility installation, gate installation, and grading to support three GFGI electronic equipment components. The anticipated contract value is $7.8‑$9.5 million with a performance period of roughly 540 days. Interested firms are asked to submit a brief capability statement (max 10 pages) by the response deadline. • Scope: Demolition, drainage/utility relocation, new utility lines, gate installation, finish grading for ILS equipment. • Estimated contract value: $7.8 M – $9.5 M; performance period ~540 calendar days. • Target respondents: Small businesses (including 8(a), HUBZone, SDVOSB, WOSB) encouraged; must meet CMMC Level 1 and subcontracting limits.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Christine Noriega(Contract specialist)

[email protected]

Key dates

Opened
10/16/2026
Closes
11/2/2026
Duration
540 days

Last updated

Details

Type
Request for Information
Industry
Construction
NAICS
238910
Solicitation №
W9126G27RA021

Budget estimate

$7,800,000 – $9,500,000

The notice specifies a target price range of $7.8 million to $9.5 million for the entire scope, indicating that the contractor’s revenue (and thus the client’s earnings) will fall within this band. Assuming typical profit margins for large‑scale construction (≈5‑10 %), the net earnings could be roughly $390 k‑$950 k, but the budget estimate here reflects the total contract value. Therefore, the expected budget range is approximately $7.8 M – $9.5 M.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Utah

Top match · 81%

SABER V Hill AFB

Closes 11/5/2026Opened 10/9/2026

U.S. Department Of Defense·Texas

80% match

B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·Kentucky

80% match

WPAFB 3rd Air Stream/ B18

Closes 10/31/2026Opened 10/17/2025

U.S. Department Of Defense·United States of America

80% match

Apache Alert Mission Complex

Closes 1/8/2027Opened 10/1/2026

U.S. Department Of Defense·Texas

80% match

Design-Build Maintenance and Repair Army Reserve (MRAR) of Equipment Concentration Site (ECS), B-56767, at North Fort Hood, TX

Closes 11/20/2026Opened 10/7/2026

U.S. Department Of Defense·Washington

80% match

Joint Base Lewis McChord (JBLM) Multi Domain Task Force (MDTF) Buildings (BLDGs) 3223 and 3224

Closes 11/13/2026Opened 9/16/2026

U.S. Department Of Defense·Mississippi

80% match

P233 AIR TRAFFIC CONTROL TOWER AND FLIGHT SIMULATOR FACILITY AT KEESLER AIR FORCE BASE, BILOXI, MS

Closes 11/4/2026Opened 10/27/2026

U.S. Department Of Defense·Texas

79% match

RFI: Fort Wolters H Barracks

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·Arizona

79% match

TOTAL ENGINEERING AND INTEGRATION SERVICES (TEIS) IV On-Ramp Opportunity

Closes 11/25/2026Opened 9/29/2026

U.S. Department Of Defense·Utah

79% match

Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance

Closes 11/18/2026Opened 10/14/2026

U.S. Department Of Defense·Hawaii

79% match

Relocate Schofield Barracks Deep Wells Above Ground, Building 1580, Schofield Barracks, Oahu, Hawaii

Closes 4/21/2027Opened 4/20/2026

U.S. Department Of Defense·Ohio

79% match

REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO

Closes 11/2/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

79% match

SOURCES SOUGHT FOR AeroStat and Tower Equipment FOR FOREIGN MILITARY SALES (FMS)

Closes 11/10/2026Opened 10/27/2026

U.S. Department Of Defense·South Carolina

79% match

AIWW Shoreline Protection Placement Areas

Closes 8/21/2027Opened 8/21/2026

U.S. Department Of Defense·New Mexico

79% match

REQUEST FOR INFORMATION/SOURCES SOUGHT

Closes 11/5/2026Opened 10/19/2026

U.S. Department Of Defense·Virginia

79% match

Cost Engineering and Related Services

Closes 11/10/2026Opened 10/27/2026

U.S. Department Of Defense·Alabama

79% match

Call for Solutions (CFS): Drone Marketplace Onboarding of US Payloads, Software, Components, and Enablers/Accessories

Closes 8/3/2031Opened 8/4/2026

U.S. Department Of Defense·Missouri

79% match

Former General Leonard Wood Army Community Hospital (FGLWACH) Pre-Demolition Environmental Survey

Closes 4/8/2027Opened 4/8/2026

U.S. Department Of Defense·District of Columbia

79% match

Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction Authority (OTA)

Closes 11/30/2026Opened 10/23/2026

U.S. Department Of Defense·North Carolina

79% match

Philpott Anchors and Instrumentation Construction

Closes 1/21/2029Opened 12/22/2025

U.S. Department Of Defense·United States of America

78% match

Vehicle Maintenance Shop, Kadena Air Base

Closes 3/31/2027Opened 9/30/2026

NYS OGS Design & Construction - Consultant Procurement·New York

78% match

Provide Aircraft Maintenance Facility – Stand‑Alone PHASED Contract

Closes 11/2/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

78% match

RFI Contractor F-16 Pilot Services

Closes 11/24/2026Opened 10/22/2026

U.S. Department Of Defense·North Carolina

78% match

MCI East Barracks Industrialized Construction Projects for Barracks via Other Transaction Authority (10 USC 2808a)

Closes 11/5/2026Opened 9/29/2026

U.S. Department Of Defense·California

78% match

Solicitation: Construct Combat Rescue Helicopter Flight Simulator Facility at Moffett ANGB

Closes 11/27/2026Opened 9/29/2026