The purpose of this project is to install a high-performance, artificial turf putting green within the Aggie Dome to enhance the training capabilities of North Carolina A&T’s athletic programs. The indoor putting green will provide a consistent, weather-independent surface for golf training and player development, a professional-grade practice environment, enhanced support for student-athletes, a durable, low-maintenance solution, and an expanded instructional resource for coaches, physical education classes, and campus programming. Key requirements include:
• Furnish and install all materials, turf, base preparation, infill, putting cups, flag assemblies, adhesives, equipment, and labor required for a complete turnkey installation.
• Field verify all existing site conditions, dimensions, elevations, and measurements within the Aggie Dome prior to ordering materials or beginning installation.
• Notify the University of any discrepancies between the field conditions and provided specifications before proceeding.
• Provide a manufacturer’s standard warranty on turf and materials, a one-year workmanship warranty, and all warranty documentation delivered at project closeout.
• Anticipated delivery and installation timeline: 6–8 weeks from issuance of the Purchase Order.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.