Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›ME-32 South Grand Cheiner Marsh Creation

U.S. Department Of Agriculture·District of Columbia

ME-32 South Grand Cheiner Marsh Creation

Closes 7/16/2026$15M – $30MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The ME-32 South Grand Chenier Marsh Creation project is located in the Mermentau Basin, Chenier Sub-Basin, and Hog Bayou Watershed in southwest Louisiana. The project aims to create and nourish approximately 466 acres of marsh using material dredged from the Gulf of America. The goal is to create new wetland habitat, restore degraded marsh, and reduce wave erosion of organic soils. The project involves the construction of approximately 20,375 LF of earthen containment dike. • The project is funded by the Coastal Wetlands Planning, Protection, and Restoration Act (CWPPRA) Task Force and the State of Louisiana's Coastal Protection and Restoration Authority (CPRA). • The project requires the contractor to have experience in marsh creation, hydraulic dredging, and earthen containment dike construction. • The contractor must provide a management plan, project schedule, and equipment plan as part of their proposal. • The award will be based on the lowest cost, technically acceptable offer.

Attached files

Contact

Marilyn MacTaggart

[email protected]

Key dates

Opened
6/16/2026
Closes
7/16/2026
Duration
339 days

Last updated

Details

Type
Request for Qualification
Industry
Civil Engineering
NAICS
237990
Solicitation №
1167159

Budget estimate

$15,000,000 – $30,000,000

The budget for this project is estimated to be more than $10,000,000, as mentioned in the document (FAR 36.204 — Disclosure of the Magnitude of Construction Projects). The actual budget may vary depending on the complexity of the project, the materials used, and the labor costs. Given the scope of the project, which involves the creation and nourishment of 466 acres of marsh and the construction of approximately 20,375 LF of earthen containment dike, it is likely that the budget will be substantial. A possible estimate for the budget could be between $15,000,000 and $30,000,000, considering the costs of materials, labor, and equipment.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Lee County·Florida

Top match · 61%

Palm Creek Lower Filter Marsh

Closes 11/5/2026Opened 9/29/2026

City of Hutchinson·Minnesota

61% match

Hutchinson, City of South Fork Crow River Sediment Forebay BMI No. 0W1.123849

Closes 12/1/2026Opened 10/29/2026

U.S. Department Of Defense·Nebraska

61% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 9/22/2027Opened 9/22/2026

U.S. Department Of Defense·South Dakota

60% match

LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2

Closes 12/3/2026Opened 10/16/2026

U.S. Department Of Defense·Texas

60% match

Houston Ship Channel (HSC) Expansion Channel Improvement Project (ECIP) 11, Package 9, Segment 4 Boggy Bayou to Sims Bayou

Closes 12/1/2026Opened 10/28/2026

Illinois DNR - Natural Resources·Illinois

60% match

27AL2558 Chauncey Marsh State Natural Area Farm Lease

Closes 11/25/2026Opened 10/5/2026

City of Charlotte·North Carolina

60% match

Gleneagles Storm Drainage Improvement Project

Rolling / TBD closeOpened 3/23/2026

City of Bellevue·Washington

60% match

Meydenbauer Bay Park Phase 2 - GC/CM Services

Closes 12/4/2026Opened 10/22/2026

City of Shawnee·Kansas

59% match

Ordinance No. 3523

Closes 6/3/2033Opened 6/3/2025

City of Fort Myers·Florida

59% match

Michigan Avenue Utility Improvement Project

Closes 11/3/2026Opened 9/24/2026

City of Shawnee·Kansas

59% match

Ordinance No. 3519

Closes 4/1/2030Opened 4/1/2025

Public Water Supply District No. 2 of St. Charles County·Missouri

59% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

Minnesota Department of Transportation·Minnesota

59% match

260132 SP 5212-42

Closes 11/18/2026Opened 10/21/2026

Beaufort - Jasper Water & Sewer Authority·South Carolina

59% match

Great Swamp Wetlands Monitoring Services

Closes 11/19/2026Opened 10/9/2026

City of Clearwater·Florida

59% match

Lower Spring Branch Stormwater Improvements

Closes 12/9/2026Opened 9/30/2026

U.S. Department Of Defense·Louisiana

59% match

Barataria Bay Waterway, Maintenance Dredging, Bar Channel

Closes 9/16/2028Opened 8/10/2026

Connecticut Town of Plainfield·Connecticut

59% match

MS4 Stormwater GIS Data Development Screening and Reporting Services

Closes 11/4/2026Opened 9/17/2026

Alabama State Port Authority·Alabama

59% match

RFQ/RFP-Upper Mobile Bay Beneficial Use Wetland Creation (Implementation) – Phase 1

Closes 11/6/2026Opened 9/22/2026

Snohomish County·Washington

59% match

2027 123rd Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 11/3/2026Opened 9/30/2026

U.S. Department Of Defense·Louisiana

59% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

Town of Cutler Bay·Florida

59% match

Cutler Bay US-1 Beautification Project-Phase 1

Closes 1/13/2027Opened 10/23/2026

City of Charlotte·North Carolina

58% match

Cedar Croft Dr 6315 Ph 2 Storm Drainage Improvement Project

Rolling / TBD closeOpened 4/20/2026

Open Space Institute·South Carolina

58% match

Meadows Boardwalk Trail Number

Closes 11/16/2026Opened 10/29/2026

U.S. Department Of Agriculture·Vermont

58% match

Green Mountain Finger Lakes Invasive Species Map and Control

Closes 11/2/2026Opened 10/8/2026

U.S. Department Of Defense·Louisiana

58% match

CONCORDIA PARISH, LOUISIANA; FC/MR and T, WBMRL; LEVEE, ENLARGEMENT AND BERMS; UPPER LAKE CONCORDIA - VIDALIA, ITEM 367-R

Closes 11/13/2026Opened 10/19/2026