The University of Central Missouri (UCM) is soliciting bids for the construction of new volleyball and wrestling locker rooms located at the Jerry M. Hughes Athletics Center in Warrensburg, MO. The project is a traditional design‑build construction effort that includes demolition (if required), site preparation, structural work, interior finishes, mechanical/electrical/plumbing installations, and final commissioning. All work must comply with UCM’s General Contractual Construction Requirements, prevailing wage rules, safety standards, and bonding requirements (bid, performance, and payment bonds through Surety2000). A mandatory pre‑bid site visit/meeting is scheduled for September 18, 2026; questions must be submitted by September 22, 2026, and bids are due September 29, 2026. The contract will be awarded after evaluation of responsiveness and responsibility.
• Scope: New locker‑room construction for volleyball and wrestling programs (approx. 10,000‑15,000 sf).
• Location: Jerry M. Hughes Athletics Center, 600 S. Washington St., Warrensburg, MO 64093.
• Delivery: Complete construction, including all trades, permits, inspections, and close‑out documentation.
• Mandatory requirements: Surety2000 electronic bonds, compliance with prevailing‑wage regulations, OSHA/EPA safety standards, and submission of warranties/operating manuals.
• Key dates: Pre‑bid site visit 9/18/2026, questions due 9/22/2026, bid deadline 9/29/2026.
• Evaluation: Responsiveness, responsibility, and compliance with bid documents.