The U.S. Coast Guard seeks a commercial contractor to replace and upgrade the manual fire‑pull stations that activate the CO₂ fire‑suppression system on the cutter USCGC HEALY. Work includes a ship‑check visit, removal of existing pull stations and associated conduit, installation of new pull stations, wiring, corner pulleys, and fire‑watch provisions, followed by testing and certification. The effort must comply with multiple Coast Guard and SFLC specifications, include a qualified Kidde technical representative, and be completed within a one‑month performance window at the Seattle homeport. Potential additional repairs are capped at $16,000.
• Scope: replace ECC fire‑pull stations for two generator rooms, install new cabling and hardware, perform fire‑watch and welding per SFLC specs.
• Location: Coast Guard Base Seattle, 1539 Alaskan Way, Seattle, WA.
• Performance period: 01 Oct 2026 – 31 Oct 2026 (≈1 month).
• Required ship‑check: 21‑25 Sep 2026 (optional, at no cost to government).
• Mandatory deliverables: fire‑prevention plan, technical representative résumé, condition‑found report for any unforeseen repairs.
• Funding: base scope plus optional repairs not to exceed $16,000.