The project involves the full replacement of the marina at Yatesville Lake State Park in Louisa, Kentucky. The work includes replacing all walkways, frames, and floats, as well as the head dock building. The contractor must follow a staging plan to permit all boats to remain in the water throughout construction. Key features of the project include concrete panels for surfacing, covered slips, and the replacement of landside and water side utilities.
• The project requires the replacement of all walkways, frames, and floats.
• The head dock building will be replaced.
• Dock A - Dock E will be replaced and will have covered slips.
• Landside utilities will remain in place except for the fuel tank and fuel line.
• A new fuel tank and fuel line will replace the existing system.
• All water side utilities will be replaced.
• The contractor must follow a staging plan to permit all boats to remain in the water throughout construction.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.