Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Connecticut guideConnecticut Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Connecticut
  4. ›Construction
  5. ›BITUMINOUS SIDEWALK RESURFACING, POWDER FOREST DR…

Connecticut Town of Simsbury·Connecticut

BITUMINOUS SIDEWALK RESURFACING, POWDER FOREST DR, SIMSBURY 2026

Closes 10/15/2026$150k – $250kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Town of Simsbury is seeking qualified contractors to perform bituminous resurfacing of Powder Forest Drive sidewalk and related improvements. The scope includes supplying all labor, materials, and equipment to resurface approximately 3,600 linear feet of sidewalk, reconstruct about 1,400 square feet of driveway aprons, and install five ADA‑compliant ramps, following the detailed specifications in the attached documents. Bids must be sealed and submitted to the Director of Finance by the deadline indicated. • Project location: Powder Forest Drive, Simsbury, CT • Work includes bituminous sidewalk resurfacing (≈3,600 lf), driveway apron reconstruction (≈1,400 sf), and five ADA ramps • All labor, materials, equipment, and related work are contractor‑provided • Submission deadline: 10:00 a.m., 15 Oct 2026 (sealed bids) • Contract type: Invitation to Bid (public, open to all vendors) • Primary contact: Chris Petron, Town of Simsbury (phone, email provided) • Required documents: specifications, schedule, wage rate addenda (see attached PDFs)

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Chris Petron

[email protected]

(860) 658-3222

Key dates

Opened
10/1/2026
Closes
10/15/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
39262

Budget estimate

$150,000 – $250,000

Based on typical market rates for bituminous resurfacing ($25‑$35 per linear foot) and concrete driveway work ($45‑$60 per square foot), plus five ADA ramps ($4‑$6 k each), the total contract value is estimated between $150,000 and $250,000. The lower bound assumes minimal material cost and efficient labor; the upper bound reflects higher material prices, labor rates, and contingency allowances.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Hastings·Nebraska

Top match · 73%

E Street Resurfacing - Burlington Ave to Pine Ave CH 2026-57

Rolling / TBD closeOpened 9/18/2026

City of Portland·Maine

72% match

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

Connecticut Town of Plainfield·Connecticut

72% match

Sidewalk Repair for the Recreation Department & Senior Center Building

Closes 11/4/2026Opened 9/26/2026

City of Charlotte·North Carolina

71% match

Margaret Wallace Road Sidewalk Summerfield Ridge Ln to Marshbrooke Rd

Rolling / TBD closeOpened 7/1/2028

York County·South Carolina

71% match

Asphalt Resurfacing for Solid Waste Convenience Center

Closes 11/4/2026Opened 10/8/2026

NYS Rochester, City of·New York

71% match

HAZARDOUS SIDEWALK REPLACEMENT PROGRAM - NORTHEAST QUADRANT CONTRACT 2027 PHASE 4

Closes 11/17/2026Opened 10/26/2026

City of Salinas·California

70% match

2026 Citywide Sidewalk Repair Project

Closes 11/23/2026Opened 10/23/2026

City of Fayetteville·North Carolina

70% match

ITB-Breezewood Avenue Sidewalk Improvements

Closes 11/12/2026Opened 10/5/2026

San Bernardino County·California

70% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

Georgia DeKalb County Government·Georgia

70% match

2026-110-ITB Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

Georgia City of Sandy Springs·Georgia

70% match

Dunwoody Road Gap Fill Sidewalk T6026-2

Closes 11/13/2026Opened 10/13/2026

City of Ontario·California

70% match

Pedestrian Intersection Improvements and Pavement Rehabilitation Project

Closes 11/18/2026Opened 10/28/2026

City of Mobile·Alabama

70% match

Residential Sidewalk Repair Program

Closes 11/6/2026Opened 10/22/2026

Miami-Dade County Department of Transportation and Public Works·Florida

70% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

City of Sunnyvale Procurement Bids and RFPs·California

70% match

Install Sidewalk on Poplar Avenue

Closes 11/18/2026Opened 10/23/2026

City of Riverside·California

70% match

Stover Avenue Sidewalk Improvements (Fury Drive to Eagle Rock Drive)

Closes 11/9/2026Opened 10/8/2026

Wisconsin Department of Transportation Bureau of Aeronautics·Wisconsin

70% match

Sidewalk Construction – Dane County Regional Airport (MSN1022 – Contract 2)

Closes 11/19/2026Opened 10/27/2026

County of DeKalb, GA·Georgia

70% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

Nevada Government·Nevada

69% match

COTTONWOOD AVENUE PONDING MITIGATION AND SIM STREET IMPROVEMENT

Closes 11/3/2026Opened 10/13/2026

Central Midlands Council of Governments·South Carolina

69% match

Sidewalk Additions along Drayton Street, Park Street, Vanderhorst Street, and Chalmers Street

Closes 11/5/2026Opened 10/2/2026

City of Charlotte·North Carolina

69% match

Robinson Church Road Sidewalk, Brawley Lane to Jones Creek Lane

Rolling / TBD closeOpened 3/11/2026

Maryland Carroll County Government - Procurement·Maryland

69% match

ldersburg Area Sidewalk Improvements

Closes 11/18/2026Opened 10/23/2026

Richland County·South Carolina

69% match

Friarsgate Boulevard Sidewalk Project

Closes 8/28/2027Opened 7/28/2026

San Joaquin County Department of Public Works·California

69% match

Main Street Resurfacing, Federal Aid Project No. STPL‑5929(334)

Closes 11/5/2026Opened 10/6/2026