The Teton School District 401 is seeking a design‑build contractor to replace the dry fire‑suppression system at Teton High School. The contractor must perform a system‑selection study, complete engineering design, obtain permits, supply all materials, and install the new dry‑system within a strict summer window, then test, commission, and train staff. Evaluation is heavily weighted toward cost (50 %) with additional points for qualifications, staffing, references, and design approach. No budget figure is disclosed, and the district reserves the right to reject or negotiate proposals.
• Scope includes full design, permitting, material supply, installation, integration with existing fire‑alarm panels, and post‑installation support.
• Work must start June 1 2026 and finish by August 15 2026; any overruns are at the contractor’s expense and must avoid school disruption.
• Submission must be sealed and delivered by 4:00 PM on April 24 2026, with questions due the same day.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.