Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Santa Maria-Bonita School District·California

BONITA SCHOOL DRINKING WATER IMPROVEMENTS

Closes 12/14/2026$1.5M – $3.5MInvitation for Bid
Get bids like this by emailBid source

Description

The Santa Maria‑Bonita School District is seeking bids to replace and upgrade the drinking‑water system serving Bonita Elementary School. The project entails installing a new 2‑inch HDPE potable‑water main totaling approximately 8,100 ft, installing associated 8‑inch steel casing where required, demolishing existing well‑site structures, and replacing all lead service lines with copper piping. The contractor must also perform trenching, back‑filling, pavement restoration, install a full complement of valves and appurtenances, and coordinate extensive utility and traffic‑control plans. Environmental compliance includes dust control, wildlife surveys (red‑legged frog, nesting birds), and archaeological safeguards. • Install 2‑in. HDPE pipe (≈ 8,100 ft) with steel casing, gate valves, blow‑off units, back‑flow preventers, and related appurtenances. • Demolish existing well‑site infrastructure and replace interior and exterior lead service lines with copper. • Perform trenching, HDD, pavement removal/restoration, curbing, sidewalks, and traffic‑control compliance per CA MUTCD and local standards. • Meet stringent environmental and regulatory requirements (CEQA, SBCAPCD dust‑control, wildlife protection, archaeological response).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Angela Gudmunds(Purchasing)

[email protected]

Key dates

Opened
10/30/2026
Questions due
12/4/2026
Pre-bid meeting
11/9/2026Mandatory
Closes
12/14/2026
Duration
180 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
2627-08-AG

Budget estimate

$1,500,000 – $3,500,000

No contract value is disclosed. Based on typical regional rates for HDPE pipe installation (~$150‑$250 per linear foot), steel casing, demolition, valve installation, and site restoration, an 8,100‑ft water‑main project in California usually ranges between $1.5 million and $3.5 million. Factors influencing the final amount include the cost of steel casing, traffic‑control measures, environmental mitigation (wildlife surveys, dust control), and the complexity of utility coordination.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

San Gabriel Unified School District·California

Top match · 82%

Project: PROJECT 25-89001

Rolling / TBD closeOpened 10/5/2026

Town of Eatonville·Florida

82% match

Drinking Water – Phase 1

Closes 11/9/2026Opened 10/6/2026

City of Holly Grove·Arkansas

82% match

Water System Improvements – Waterline Replacement

Closes 11/18/2026Opened 10/25/2026

City of DeLand·Florida

81% match

2026 PARTS A-C, & F WALTS AVE & NEW ST WATER MAIN IMPROVEMENTS

Closes 11/12/2026Opened 10/9/2026

Oregon Parks and Recreation Department·Oregon

81% match

14546 Jessie M. Honeyman SP Water Intake Replacement (Construction)

Closes 11/2/2026Opened 10/7/2026

City of Ontario·California

81% match

UT 1065 FY2026-27 Water Main Improvements

Closes 11/18/2026Opened 10/14/2026

San Gabriel Unified School District·California

81% match

San Gabriel USD - McKinley ES Irrigation Replacement - DIV 01

Rolling / TBD closeOpened 8/4/2026

Maryland Harford County Public Schools·Maryland

80% match

27-JHP-004 Stormwater Repairs at Forest Lakes Elementary and North Harford Elementary Middle Schools

Closes 11/17/2026Opened 10/21/2026

City of Holly Grove·Arkansas

80% match

City of Holly Grove Water System Improvements – Water Tank Rehabilitation and Plant Building Modification

Closes 11/18/2026Opened 10/25/2026

Western Virginia Water Authority·Virginia

80% match

INVITATION TO BID: BRANDON AVENUE WATER DISTRIBUTION SYSTEM IMPROVEMENTS – PHASE 1

Closes 11/4/2026Opened 10/7/2026

Contra Costa Water District·California

80% match

Bollman Water Treatment Plant Improvements

Closes 12/10/2026Opened 10/29/2026

Greenville County School District·South Carolina

80% match

HVAC Water Treatment

Closes 11/17/2026Opened 10/23/2026

St. Helena Parish Police Jury·Louisiana

80% match

2026 CWEF Water System Improvements

Closes 11/5/2026Opened 10/9/2026

Chula Vista Elementary School District·California

80% match

ROOFING REPLACEMENT AT VARIOUS LOCATIONS

Closes 11/18/2026Opened 10/8/2026

City of Hollywood·Florida

80% match

Water Treatment Plant Maintenance Package ‘A’; Project No. 25-4261

Closes 11/25/2026Opened 10/20/2026

Greenville County Schools·South Carolina

80% match

HVAC Water Treatment

Closes 11/17/2026Opened 10/23/2026

Hillsborough County Public Schools·Florida

80% match

HVAC Water Treatment

Closes 11/30/2026Opened 10/27/2026

Connecticut Town of Waterford·Connecticut

79% match

REPLACEMENT OF EXISTING PLASTIC WATER SERVICES WITH NEW COPPER WATER SERVICES

Closes 11/12/2026Opened 10/19/2026

Eastern Municipal Water District·California

79% match

Purified Water Replenishment SJV Advanced Water Purification Facility

Closes 11/19/2026Opened 8/25/2026

City of Hollywood·Florida

79% match

Water Treatment Plant Maintenance Package 'B'; Project No. 25-4262

Closes 12/3/2026Opened 10/26/2026

Georgia Emanuel County Board of Education·Georgia

79% match

Swainsboro High School Concession Stand Pump Station Upgrade

Closes 11/13/2026Opened 10/30/2026

City of Redlands·California

79% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Gwinnett County Government·Georgia

79% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/21/2026

Gwinnett County Government·Georgia

79% match

Ravenwood Drive Water Main Replacement

Closes 12/9/2026Opened 10/27/2026

Joint Municipal Water and Sewer Commission·South Carolina

79% match

Lacy Springs/Cool Springs Contamination Area Water Improvements

Closes 11/24/2026Opened 10/21/2026