Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Mini-Float Switches for Residential Low Pressure Sewer…

City of Port St. Lucie·Florida

Mini-Float Switches for Residential Low Pressure Sewer Grinder Pump Systems

Closes 11/5/2025$1.5M – $2.5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Port St. Lucie is seeking to establish a contract with a qualified proposer to provide Mini-Float Switches for Residential Low Pressure Sewer Grinder Pump Systems. The contract term is for three years, with two optional one-year extensions. The City is expecting to purchase approximately 10,000 float switches annually. The switches must meet specific specifications, including being mercury-activated, narrow-angle, and UL listed for use in non-potable water and sewage. • The switches must have a flexible 18-gauge 30-foot cable and be weather and water-resistant. • The float size must be 2 7/8-inch diameter x 4 1/2-inch long, with a high impact and corrosion-resistant polypropylene housing. • The switches must have a minimum 2-year limited warranty, and the contractor is responsible for all shipping charges related to warranty claims. • The delivery location is the Utility Warehouse, and delivery times are limited to between 8:00 am and 2:00 pm. • The number of days for delivery after receipt of order is 5 calendar days.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Michael Jolly(Procuring Agent)

[email protected]

(772) 344-4121

Key dates

Opened
9/26/2025
Questions due
10/15/2025
Closes
11/5/2025
Duration
3 years

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
20250214

Budget estimate

$1,500,000 – $2,500,000

The budget for this contract can be estimated based on the annual purchase of approximately 10,000 float switches. Assuming an average cost of $50 per switch, the total annual budget would be around $500,000. Considering the contract term of three years, with optional extensions, the total budget could range from $1.5 million to $2.5 million. Factors that may influence the payment range include the actual cost of the switches, the number of switches purchased annually, and any potential extensions or renewals of the contract.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Louisiana Sewerage and Water Board of New Orleans·Louisiana

Top match · 64%

Submersible Sewage Pumps

Closes 11/12/2026Opened 10/22/2026

The City of Columbus·Ohio

63% match

RFQ033956 - S&DJP - Thermal Limt Switch

Closes 11/3/2026Opened 10/28/2026

City of Montpelier·Vermont

63% match

Wastewater Collection System – Suction Lift Pump Station Equipment Preselection

Closes 12/3/2026Opened 10/28/2026

City of Pasadena·California

63% match

Grounding Switches 35kV

Closes 11/30/2026Opened 10/28/2026

City of Montpelier·Vermont

63% match

Wastewater Collection Suction Lift Pump Systems

Closes 11/26/2026Opened 10/28/2026

The City of Columbus·Ohio

63% match

RFQ033960 - 6009-PAWP- Spare FCI Flow Switches

Closes 11/3/2026Opened 10/28/2026

U.S. Department Of Defense·California

63% match

59--SWITCH,PRESSURE

Closes 11/1/2026Opened 10/22/2026

Sewerage and Water Board of New Orleans·Louisiana

62% match

Submersible Sewage Pumps

Closes 11/12/2026Opened 10/21/2026

City of Slidell·Louisiana

62% match

27-B008 PS 200 Lindberg Sewer Lift Station Upgrades

Closes 11/19/2026Opened 10/14/2026

Gwinnett County Government·Georgia

62% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026

Georgia Bryan County Board of Commissioners·Georgia

62% match

SEWER GRINDER SYSTEM

Closes 12/2/2026Opened 10/29/2026

City of South San Francisco·California

62% match

Oyster Point Sanitary Sewer Pump Station Relocation

Closes 11/12/2026Opened 10/1/2026

U.S. Department Of Defense·California

62% match

59--SWITCH,PRESSURE

Closes 11/1/2026Opened 10/22/2026

City of Somers Point·New Jersey

62% match

Sewer Pump Station Maintenance

Closes 11/10/2026Opened 10/9/2026

U.S. Department Of Defense·Maine

62% match

43--HOUSING,LIQUID PUMP

Closes 11/17/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

62% match

59--SWITCH,PRESSURE

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

62% match

59--SWITCH,PRESSURE

Closes 11/5/2026Opened 10/25/2026

City of Lake Elsinore·California

62% match

Modular Floating Platforms

Closes 12/1/2026Opened 9/23/2026

U.S. Department Of Defense·United States of America

62% match

59--SWITCH,PRESSURE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

62% match

59--SWITCH,PRESSURE

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·California

62% match

59--SWITCH,PRESSURE

Closes 11/4/2026Opened 10/25/2026

City of Douglas·Wyoming

62% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

Gwinnett County Government·Georgia

61% match

Beaver Ruin Diversion Pump Station Grinders Replacements Project

Closes 11/20/2026Opened 10/7/2026