Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›SMF Pedestrian Walkway - Riparian Public Art Installation…

County of Sacramento·California

SMF Pedestrian Walkway - Riparian Public Art Installation Project

Closes 11/19/2026$150k – $250kInvitation for Bid
Get bids like this by emailBid source

Description

The County of Sacramento is soliciting sealed bids for the installation of a large suspended‑ceiling artwork titled “Riparian Public Art Installation” at the Sacramento International Airport pedestrian walkway. The work includes delivery, uncrating, staging, rigging, installation of approximately 12,000 glass rondelles, artist‑review adjustments, inspections, cleanup, documentation, and final acceptance. All labor, materials, equipment, and incidentals must be provided by the contractor, who must self‑perform 100 % of the field work and hold the appropriate C‑61/D‑34 California contractor license. The contract is awarded on a base‑bid‑only basis with a total estimated construction cost of $210,000. Bids must be submitted electronically by 2:00 PM on November 19, 2026; award is expected December 18, 2026. • Scope: Fine‑art installation, rigging, suspended‑ceiling engineering, and related construction services. • Location: North Pedestrian Walkway, Sacramento International Airport, Sacramento, CA. • Estimated value: $210,000. • Mandatory licenses: California C‑61/D‑34 contractor license; registration with California D.I.R. • Bid security: Minimum 10 % bid bond or equivalent. • No pre‑bid meeting; questions due by November 6, 2026. • Award based on lowest responsive bid; contract includes performance and payment bonds.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Song hoon Ko(Sr Contract Services Officer)

[email protected]

(916) 874-0533

Key dates

Opened
10/26/2026
Questions due
11/6/2026
Closes
11/19/2026
Projected award
12/18/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238990
Solicitation №
41016

Budget estimate

$150,000 – $250,000

The solicitation lists an estimated construction cost of $210,000. Considering typical contingencies, bonding costs, and potential change orders, the final contract value is likely to fall between $150,000 and $250,000. Lower end reflects a tight scope with minimal change; upper end accounts for additional labor, material price fluctuations, and unforeseen site conditions.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Sacramento·California

Top match · 81%

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 11/4/2026Opened 9/30/2026

City of Pasadena·California

80% match

CDBG Sidewalk Improvement Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Merced·California

80% match

RFP for Murals at M St Bridge and Corp Yard

Closes 11/30/2026Opened 8/12/2026

City of Sunnyvale Procurement Bids and RFPs·California

80% match

Install Sidewalk on Poplar Avenue

Closes 11/18/2026Opened 10/23/2026

City of Pasadena·California

80% match

HSIP Cycle 11 Pedestrian Crossing Enhancements

Closes 11/19/2026Opened 10/26/2026

City of Salinas·California

79% match

2026 Citywide Sidewalk Repair Project

Closes 11/23/2026Opened 10/23/2026

City of Santa Cruz·California

79% match

HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT

Closes 11/5/2026Opened 10/21/2026

City of Pasadena·California

79% match

Annual ADA Citywide/Miscellaneous Sidewalk Improvement Program and Street Drainage Project FY 2027

Closes 11/20/2026Opened 10/29/2026

City of Redlands·California

79% match

Church Street and San Bernardino Avenue Traffic Signal Installation

Closes 11/16/2026Opened 10/22/2026

City of Napa·California

79% match

Citywide Striping - Phase 3

Closes 11/16/2026Opened 10/27/2026

City of Long Beach·California

79% match

R-7259 Palo Verde Avenue Pedestrian Bridge Sign Project 3003210017

Closes 11/10/2026Opened 9/30/2026

City of Long Beach·California

78% match

R-7298 1st Street Pedestrian Improvements

Closes 11/10/2026Opened 10/7/2026

County of Orange·California

78% match

Modjeska Grade Road, Road and Drainage Improvements

Closes 11/10/2026Opened 10/13/2026

County of Okaloosa·Florida

78% match

Covered Walkway Phase 2

Closes 11/25/2026Opened 10/26/2026

Sacramento Metropolitan Air Quality Management District·California

78% match

Advertising, Public Relations and Media Buying

Closes 11/6/2026Opened 10/8/2026

LA County Internal Services Department·California

78% match

ROOF REPLACEMENT PROJECTS (MANDATORY JOB WALK)

Closes 11/3/2026Opened 10/20/2026

California Department of Transportation·California

78% match

Bridge work, erosion control, and lighting system.

Closes 11/5/2026Opened 10/5/2026

County of Sacramento·California

78% match

Construction Manager at Risk Services for Sacramento International Airport Airfield Maintenance Facility Project

Closes 12/1/2026Opened 9/10/2026

LA Public Works Engineering Bureau·California

78% match

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

City of Riverside·California

78% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

County of Sacramento·California

78% match

Hazel Avenue at U.S. 50 Interchange Segment 1 Tree Removal Project

Closes 11/12/2026Opened 10/26/2026

San Bernardino County·California

78% match

Randall Avenue Sidewalk

Closes 12/3/2026Opened 10/27/2026

City of Santa Cruz·California

77% match

Santa Cruz Gateway Landscape Improvements

Closes 11/5/2026Opened 9/22/2026

LA Public Works Engineering Bureau·California

77% match

CENTRAL AVENUE PEDESTRIAN IMPROVEMENTS & CENTRAL AVENUE STREETSCAPE IMPROVEMENTS FEDERAL NO. CML-5006(896) & FEDERAL NO.

Closes 12/9/2026Opened 10/28/2026

Town of Westwood·Massachusetts

77% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026