The Alaska Department of Fish and Game is seeking proposals for the renovation of the Lower Bonnie Lake Boat Launch Facility. The project involves replacing the existing floating dock with an Elevated Light Penetrating (ELP) platform, upgrading the pit toilet to a CXT vault latrine, and completing road work to realign sharp turns and prevent erosion. The contract will be divided into two phases, with Phase I including site surveys, concept design, and cost estimation, and Phase II including final design and construction. The proposed contract term is from the date of contract signature to September 30, 2026.
Key aspects of the project include:
• Replacement of the existing floating dock with an ELP platform
• Upgrade of the pit toilet to a CXT vault latrine
• Road work to realign sharp turns and prevent erosion
• Division of the contract into two phases
• Proposed contract term from the date of contract signature to September 30, 2026
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.