The Colonial School District is seeking qualified contractors to perform security‑related and ADA‑compliant renovations at William Penn High School’s athletic complex. Work is divided into three contracts covering selective demolition, site work & concrete (C‑01), miscellaneous metal fabrication and railings (C‑02), and general trades such as carpentry, drywall, painting, door‑hardware installation, and ADA ramp modifications (C‑03). The project will be executed during the summer 2027 school break and must comply with Delaware prevailing‑wage rules, mandatory drug‑testing, craft‑training, VOC restrictions, and a 75 % construction‑waste diversion goal. Bids are sealed, must include a 10 % bid bond, and be submitted by 19 Nov 2026.
• Scope includes demolition, concrete foundations, metal railings, door hardware, ADA ramps, and general interior finishes.
• Requires extensive submittals: shop drawings, product data, certifications, safety, waste‑management, and VOC compliance documentation.
• Mandatory compliance with Delaware prevailing‑wage rates, insurance/bond thresholds, and a drug‑testing program for all on‑site personnel.