This contract calls for comprehensive foundation remediation and concrete repair work at the Conklingville Dam (NY S DAM ID #205‑0415). The scope includes demolition of existing structures, installation of new concrete and reinforcement, construction of relief‑well and manhole systems, drainage and water‑control measures, utility protection, environmental and hazardous‑material handling, and associated electrical monitoring equipment. The contractor must also provide temporary facilities, traffic‑control plans, and comply with extensive NYS building, environmental, and safety codes.
• Remove and replace deteriorated concrete on dam, spillway, outlet structures, and associated masonry.
• Install new relief‑well, manhole, drainage pipe, check and butterfly valves, and instrumentation (ultrasonic sensors, data loggers).
• Perform site grading, erosion‑and‑sediment control, utility stake‑out, and temporary water‑control/coffer‑dam construction.
• Manage hazardous‑material (asbestos, lead‑paint) abatement, install a standby generator, and provide all required temporary utilities and safety measures.