Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Colorado guideColorado Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More engineering services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Colorado
  4. ›Engineering Services
  5. ›WTF Pipeline Connections Design

Colorado

WTF Pipeline Connections Design

Closes 6/5/2026Login required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Click the “Link to bid” button below for more information.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
4/24/2026
Closes
6/5/2026

Last updated

Details

Industry
Engineering Services
NAICS
541330

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Redlands·California

Top match · 58%

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of San Bernardino·California

56% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

City of Columbus Ohio·Ohio

56% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

U.S. Department Of Transportation·District of Columbia

56% match

Pipeline Safety Research and Development (R&D) - Research Announcement 12

Closes 11/2/2026Opened 10/15/2026

U.S. Department Of The Interior·California

55% match

FWS - Pixley NWR Water Recirculation Design-Build

Closes 11/30/2026Opened 10/30/2026

City of Columbus·Ohio

55% match

PAWP Wellfield Development

Closes 11/4/2026Opened 10/5/2026

The City of Columbus·Ohio

55% match

RFQ033812 - PAWP Wellfield Development

Closes 11/4/2026Opened 10/7/2026

City of Winston Salem·North Carolina

55% match

Pipe Storage Building Design for Utilities

Closes 11/10/2026Opened 10/16/2026

U.S. Department Of Defense·California

55% match

BRINE PIPELINE ACCESS IMPROVEMENTS

Closes 2/4/2027Opened 8/12/2026

U.S. National Institutes of Health·United States of America

55% match

BRAIN Initiative Connectivity across Scales (BRAIN CONNECTS): Specialized Projects for Scalable Technologies (U01 Clinical Trial Not Allowed)

Closes 10/4/2027Opened 8/26/2024

The Village of Royal Palm Beach·Florida

55% match

SR80 Irrigation Boring

Closes 11/13/2026Opened 10/30/2026

City of Marysville, Ohio·Ohio

55% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

City of Plano·Texas

55% match

RFQ Lavon Farms Connector - K Avenue to Jupiter Road | Project No. ENG-S-00033

Closes 12/9/2026Opened 10/26/2026

City of Austin·Texas

55% match

West Congress (Radam/St. Elmo) Water & WW Pipeline Renewal

Rolling / TBD closeOpened 7/13/2026

City of Beaumont·California

55% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Tarrant Regional Water District·Texas

55% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

The Metropolitan Water District of Southern California·California

55% match

Inland Feeder/San Bernardino Valley Municipal Water District (SBVMWD) Foothill Pump Station Intertie, Stage 1

Closes 11/17/2026Opened 8/4/2026

City of Cortez·Colorado

54% match

2027 Raw Waterline Inspection Project

Closes 12/15/2026Opened 10/28/2026

San Francisco Water Power Sewer·California

54% match

WD-2914 Bay Division Pipelines Nos. 1 Through 4 Lining and As-Needed Pipeline Repairs

Closes 11/19/2026Opened 10/8/2026

Connecticut Cromwell Fire District·Connecticut

54% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

City of El Paso De Robles·California

54% match

WATER 24in POTALBE MAIN CROSSING HIGHWAY CROSSING

Closes 11/18/2026Opened 10/29/2026

Connecticut Cromwell Fire District·Connecticut

54% match

Cromwell Fire District - Water Interconnection Project

Closes 11/6/2026Opened 9/29/2026

Greene County·Virginia

54% match

#SMART18 - Route 670 Connector A Design-Build Project

Closes 2/9/2027Opened 10/30/2026

U.S. Department Of Transportation·District of Columbia

54% match

Joint Pipeline Advisory Committees: Repair Criteria Review

Closes 11/5/2026Opened 10/29/2026