This contract awards a comprehensive construction effort to repair and widen the Main Loop Road (Community Park Road) on the Washtenaw Community College campus. The work includes demolition of existing pavement, sub‑grade preparation, installation of new aggregate base courses, hot‑mix asphalt paving, concrete curbs, gutters, sidewalks, utility relocations, storm‑water drainage improvements, traffic‑control device installation, erosion‑control measures, and site restoration with turf and seed‑mix. The contractor must provide all labor, equipment, materials, permits, safety measures, portable restrooms, and maintain at least one traffic lane open throughout construction. A $20,000 allowance is set aside for scope changes, and the project must be completed within a tight schedule.
• Road widening to 22 ft, including new asphalt and concrete curb‑gutter assemblies.
• Utility relocation, storm‑water infrastructure, and erosion‑control compliance.
• Required safety, traffic‑control, and environmental (NPDES) permits; mandatory site‑visit on June 17 2026.
• Project schedule: start Oct 10 2026, finish Nov 30 2026 (≈ 51 days).