The Colorado Division of Parks and Wildlife is seeking bids for the excavation of material from ponds located at Hugo State Wildlife Area and the transport and placement of excavated material to locations within the area. The project also includes the installation of water control structures, riprap, fishing jetties, and other associated site work. The contractor will be responsible for mobilization, surveying, and excavation, as well as the installation of water control structures and other features.
• The project involves the excavation of material from several ponds, including Pond 2, Pond 3, Pond 9, Pond 10, Pond 11, Pond 16, Pond 17, and Pond 18.
• The contractor will be required to install water control structures, including 10' and 12' structures with piping, at various ponds.
• The project also includes the removal of cattails and the reshaping of a gradually sloped inlet channel.
• The contractor will be paid based on a lump sum bid price for each bid item, with progress payments considered based on the percentage of work completed.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.