The Bassie Spring Improvement Project is a small‑business set‑aside, firm‑fixed‑price construction contract to remove an old spring diversion structure, install a new spring box with gravel pack, PVC pipe, float valve and poly‑trough, and erect a 650‑foot pipe‑rail fence around the spring enclosure on BLM‑managed land in Churchill County, Nevada. Work must be completed within a 60‑day window after the notice to proceed and no later than 30 Oct 2027. The contractor supplies all materials, equipment, and labor, complies with BLM environmental, cultural‑resource, and fire‑prevention requirements, and must meet Davis‑Bacon wage determinations.
• Remove and dispose of existing spring diversion box, pipeline, and trough.
• Install new spring diversion box, 175 ft of 1‑in PVC pipe, gravel pack, float shut‑off valve, and an ~625‑gal poly trough.
• Construct a 650‑ft pipe‑rail fence (12‑ft post spacing, top rail ~38.5 in above ground).
• All work performed on BLM land; contractor responsible for transport, site protection, and compliance with environmental and historic preservation statutes.
You found this one. Bid Banana has 1.6M+ bids and awards.
You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.