The project involves the removal of existing exterior vestibules and walkways, and the installation of new walkways, a fixed prefinished aluminum storefront window system, and a new entry/security vestibule. The existing HVAC system will be removed and replaced with a new ACT system, and the exterior work includes the preparation of the existing outdoor patio to remove the current silicone water-proofing system and replace it with a new fluid-applied PMMA system. The project requires the removal of the entire acoustic ceiling tile system, including lighting and mechanical grilles and diffusers, and the installation of new LED lighting, grilles, and diffusers.
• The project consists of the removal of existing exterior vestibules and indicated walkways.
• New walkways will be placed where demolished.
• The front (employee only) vestibule will be replaced by a new fixed prefinished aluminum storefront window system.
• The covered side entrance will be replaced with the same system but have an exterior sliding entrance door opening to the new entry/security Vestibule.
• All new glazing shall be ballistic resistant.
• The new Vestibule enclosure will have its existing gypsum board wall system extended to the bottom of the trusses, acoustic ceiling, and insulated.