Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Minnesota guideMinnesota Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Minnesota
  4. ›Construction
  5. ›2026 Passenger Boarding Bridge Replacements - Phase 2

Metropolitan Airports Commission·Minnesota

2026 Passenger Boarding Bridge Replacements - Phase 2

Closes 7/14/2026$2M – $5MInvitation for BidLogin requiredFee to access
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Metropolitan Airports Commission is seeking a contractor to refurbish, relocate, and replace a passenger boarding bridge, install a new fixed walkway, and perform associated civil, structural, electrical, and security upgrades at Minneapolis‑St. Paul International Airport. This project includes demolition of existing bridge components, installation of new bridge and caissons, concrete pavement work, fuel pipe and hydrant installation, and integration of camera systems and door card readers to meet current MAC design standards. • Refurbish and relocate one (1) passenger boarding bridge and install a new 77‑ft fixed walkway. • Provide civil works: concrete removal/restoration, fuel pipe and hydrant pit installation, and pavement markings. • Install electrical and security components: power units, camera systems, door card readers, and related distribution. • Deliver all associated foundations, caissons, and structural supports. • Must be a QuestCDN plan‑holder and submit bids electronically through the online bid portal.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Zuleyka Marquez(Owner)

[email protected]

(612) 467-0927

Key dates

Opened
6/30/2026
Pre-bid meeting
7/2/2026
Closes
7/14/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238990
Solicitation №
Quest Number: 10250465

Budget estimate

$2,000,000 – $5,000,000

The bid package includes a refurbished boarding bridge, a new 77‑ft walkway, concrete pavement, fuel system installation, and multiple electrical/security components. Based on typical market rates for such airport infrastructure projects (bridge refurbishment $1–2 M, walkway $0.5 M, civil works $0.5 M, electrical/security $0.2–0.5 M), the total contract value is likely in the $2 M–$5 M range. Larger airports often see higher labor and material costs, but the limited quantity (single bridge) caps the upper bound.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

LA Public Works Engineering Bureau·California

Top match · 72%

BRIDGE REPAIR MAINTENANCE GROUP 2 (RE-BID)

Closes 12/9/2026Opened 10/28/2026

Virginia Department of Transportation·Virginia

72% match

A98_2026 BRIDGE REPLACEMENT

Closes 11/18/2026Opened 9/9/2026

Town of Pulaski·Virginia

71% match

PROPOSED BRIDGE SUPERSTRUCTURE REPLACEMENT WEST COMMERCE STREET OVER PEAK CREEK

Closes 12/16/2026Opened 9/25/2026

Port of Portland·Oregon

71% match

Portland International Airport Passenger Boarding Bridges Floor Replacement

Closes 11/18/2026Opened 10/28/2026

City of Meriden·Connecticut

71% match

B027-23 Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

Division of Highways·North Carolina

71% match

Replacement of Bridge 560098 (Purchase Order DM00407)

Closes 11/18/2026Opened 10/28/2026

Delaware River Joint Toll Bridge Commission·New Jersey

71% match

Portland‑Columbia Toll‑Supported Pedestrian Bridge Rehabilitation

Closes 11/5/2026Opened 10/1/2026

City of St. Louis·Missouri

71% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

Virginia Department of Transportation·Virginia

70% match

A85_2026 BRIDGE DECK REPLACEMENT

Closes 11/18/2026Opened 9/9/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

70% match

Pell Bridge Rehabilitation

Closes 11/2/2026Opened 9/1/2026

Rhode Island Turnpike and Bridge Authority·Rhode Island

70% match

Addendum 3

Closes 11/2/2026Opened 9/1/2026

Illinois THA - Toll Highway Authority·Illinois

70% match

Change Order Notice I-25-2005 RM Tollway (I-88), Bridge Recon at CNR, Phase II Engineering Services

Closes 11/19/2026Opened 10/20/2026

California Department of Transportation·California

70% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026

Oregon Department of Transportation·Oregon

70% match

Boone Bridge Northbound Joint Replacement

Closes 11/10/2026Opened 10/21/2026

City of St. Louis Board of Public Service·Missouri

70% match

Union Lindell Bridge Replacement

Closes 11/3/2026Opened 9/16/2026

U.S. Department Of Agriculture·California

69% match

HUMBOLT PACIFIC CREST TRAIL BRIDGE REPLACEMENT

Closes 11/28/2026Opened 10/29/2026

New Jersey Turnpike Authority (Njta)·New Jersey

69% match

Contract No. T100.623 Bridge Deck Repairs and Resurfacing, Milepost 92 to 122 and the Newark Bay-Hudson County Extension (2027-2028)

Closes 11/9/2026Opened 10/16/2026

Massachusetts Department of Transportation·Massachusetts

69% match

607349 NORWELL- PEMBROKE- MARSHFIELD- BRIDGE REPLACEMENT, N-24-004=P-05-008, ROUTE 3 (NB & SB) OVER

Closes 11/13/2026Opened 1/30/2026

Connecticut City of Meriden·Connecticut

69% match

Oregon Road Bridge Replacement

Closes 12/10/2026Opened 10/30/2026

City of Sparta·Tennessee

69% match

Walking Bridge Decking & Handrail Replacement Bid 2026

Closes 11/10/2026Opened 10/26/2026

City of Cedar Rapids·Iowa

68% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

Georgia City of Atlanta·Georgia

68% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

California Department of Transportation·California

68% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

City of Atlanta·Georgia

68% match

QBS/PS/DOT/2609-1270086/Marietta Road Bridge Replacement Over CSX - Phase I

Closes 11/23/2026Opened 10/21/2026

Georgia City of Chattahoochee Hills·Georgia

68% match

RFP27-001 Cochran Mill Park Bridge Repair/Replacement

Closes 11/19/2026Opened 10/16/2026