Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›Multiple Park Building Roof Replacements – North

Miami-Dade County·Florida

Multiple Park Building Roof Replacements – North

Closes 1/13/2026
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

AD BARNES Multiple Building Roof Replacement - POOL BUIDLING - LEISURE ACCESS BUILDING (BUILDING 9) 1. CONTRACTOR shall review all documents, specifications, and scope of work provided by the Miami-Dade County Parks, Recreation and Open Spaces Construction & Maintenance Division Project Manager for work to be completed. 2. CONTRACTOR shall furnish all labor, equipment and materials required to provide the complete removal and disposal of the existing Roofing system, and replacement of new modified bitumen roof system. 2.1. Scope of work applies for the application of a multi-ply modified bitumen roof system to areas as applies will be installed per manufacture’s specifications to specific roof conditions. The scope of work applies for the new installation of product approved modified bitumen roof system to include deck specific preferred assembly. Roof system must include minimum three (3) membranes (smooth base plies and granulated cap ply), fasteners, insulations, flute filler (If metal deck) and air vapor retardant if needed. Membranes can be torch applied or hot asphalt applied. Roof System shall have a Class A Fire Rating. Contractors shall be capable of providing a 30-year manufacturer NOL warranty. The Basis-of-Design as manufactured by Polyglass USA (FBC Approval FL1654) consists of: Polytherm polyisocyanurate insulation (not required with lightweight decks) Gypsum coverboard (not required with lightweight decks) Elastobase V anchor sheet (only required with lightweight decks) Two (2) plies of Elastoflex S6 base ply Elastoflex S6 G FR Bright White cap ply 2.2. Substitutions for alternate manufacturers will be reviewed, provided that the substitution materials are equal to or greater than those specified. Substitution material properties to be equal or greater include, but are not limited to, ASTM standards, membrane thickness, fire rating, wind uplift, and warranty terms. Rockway Park Roof Replacement - POOL BUILDING - RECREATION CENTER SMALL - SMALL SHELTER 1. CONTRACTOR shall review all documents, specifications, and scope of work provided by the Miami-Dade County Parks, Recreation and Open Spaces Construction & Maintenance Division Project Manager for work to be completed. 2. CONTRACTOR shall furnish all labor, equipment and materials required to provide the complete removal and disposal of the existing Roofing system; and replacement of new metal standing seam roof system: 3. CONTRACTOR shall comply with Resolution No. R-54-18 Cool Roofs, which require the utilization of Cool Roofs for all new construction, roofing maintenance, and re-roofing work where the surface material is replaced on County owned properties. 4. CONTRACTOR shall apply new 2024 building codes as required. 5. CONTRACTOR shall furnish all labor and materials for the installation of Type G or K hanging Gutters, 611 aluminum upon completion of the roofing system. The installation includes the entire perimeter with downspouts at each corner. 5.1. Scope of work applies for the application of a standing seam metal roof system, 24 gauge 1611 panel/ bare galvalume finish (ENGLERT A1300 Mechanically Seamed Panel), to include all engineered calculations, drawings, specifications, architect and/or engineering fees, and reports required for permitting by the building department. Contractor will submit product approval and manufactures specifications upon pre-construction meeting. Jefferson Reaves Roof Replacement - BUILDING FOR FULL ROOF REPLACEMENT - JEFFERSON REAVES BUILDING 1. CONTRACTOR shall review all documents, specifications, and scope of work provided by the Miami-Dade County Parks, Recreation and Open Spaces Construction & Maintenance Division Project Manager for work to be completed. 2. CONTRACTOR shall furnish all labor, equipment and materials required to provide the complete removal and disposal of the existing Roofing system; and replacement of new metal standing seam roof system: 3. CONTRACTOR shall comply with Resolution No. R-54-18 Cool Roofs, which require the utilization of Cool Roofs for all new construction, roofing maintenance, and re-roofing work where the surface material is replaced on County owned properties. 4. CONTRACTOR shall apply new 2024 building codes as required. 4.1. Scope of work applies for the application of a standing seam metal roof system, 24 gauge 16” panel/ bare galvalume finish (ENGLERT A1300 Mechanically Seamed Panel}, to include all engineered calculations, drawings, specifications, architect and/or engineering fees, and reports required for permitting by the building department. Contractor will submit product approval and manufactures specifications upon pre-construction meeting. Westwood Park Roof Replacement - WESTWOOD PARK MAIN BUILDING 1. CONTRACTOR shall review all documents, specifications, and scope of work provided by the Miami-Dade County Parks, Recreation and Open Spaces Construction & Maintenance Division Project Manager for work to be completed. 2. CONTRACTOR shall furnish all labor, equipment and materials required to provide the complete removal and disposal of the existing Roofing system; and replacement of new metal standing seam roof system: 3. CONTRACTOR shall comply with Resolution No. R-54-18 Cool Roofs, which require the utilization of Cool Roofs for all new construction, roofing maintenance, and re-roofing work where the surface material is replaced on County owned properties. 4. CONTRACTOR shall apply new 2024 building codes as required. 4.1. Scope of work applies for the application of a standing seam metal roof system, 24 gauge 16” panel/ bare galvalume finish (ENGLERT A1300 Mechanically Seamed Panel), to include all engineered calculations, drawings, specifications, architect and/or engineering fees, and reports required for permitting by the building department. Contractor will submit product approval and manufactures specifications upon pre-construction meeting. Contractor shall comply with Resolution No. R-54-18 Cool Roofs, which require the utilization of Cool Roofs for all new construction, roofing maintenance, and re-roofing work where the surface material is replaced on County owned properties. This solicitation is non-exclusive and with no minimal guarantee. EXPERIENCE: Bidder or vendor key personal experience shall have completed at least two (2) projects of similar size and scope in accordance with Resolution No. R-1122-21. Bidder shall provide evidence of this experience; project names; dollar values and contract information for verification purposes. This information should be entered on form 00450 Bidder’s Statement of Qualifications and Business References, highlighting at least two comparable projects and using additional pages as needed. ADDENDUMS - RFI’S All Requests for Information (RFI) must be submitted electronically, in word format, by 01/05/2026 to [email protected] and a copy filed with the Clerk of the Board at [email protected]. NO PHONE CALLS WILL BE ACCEPTED. Contractor must refer to the Request for Price Quotation (RPQ) and associated project documents for the detail Scope of Work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
12/11/2025
Closes
1/13/2026

Last updated

Details

Industry
Construction
NAICS
238160

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Arkansas

Top match · 71%

NW Park Tree Replacement

Rolling / TBD closeOpened 8/30/2026

Texas Parks & Wildlife Department·Texas

71% match

Workshop Roof at Goliad State Park

Closes 12/8/2026Opened 10/26/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

70% match

GARAGE ROOF REHAB-CABIN 137 AT BAKER CAMP IN HARRIMAN STATE PARK

Closes 11/9/2026Opened 10/19/2026

City of Portland·Maine

70% match

Reiche School Roof Replacement (PDF, 99.89 KB)

Closes 11/19/2026Opened 10/17/2026

Northbridge Housing Authority·Massachusetts

69% match

Roof Replacement

Closes 11/13/2026Opened 10/15/2026

Northeast Wisconsin Technical College·Wisconsin

69% match

Aurora Roof Replacement

Closes 11/10/2026Opened 10/19/2026

U.S. Department Of Agriculture·Idaho

69% match

Fenn Ranger Station roofing replacement

Closes 11/19/2026Opened 10/15/2026

Northern Kentucky Water District·Kentucky

69% match

Roof Replacement for Fort Thomas Treatment Plant Chemical Building

Closes 12/4/2026Opened 10/30/2026

NYS State University Construction Fund·New York

69% match

Replace Roofs - Various Buildings

Closes 11/10/2026Opened 10/16/2026

City of Ontario·California

68% match

FM26-001 Chaffey Community Museum of Art Roof Replacement

Closes 11/10/2026Opened 10/8/2026

City of Chicago·Illinois

68% match

Eugene Sawyer Water Purification Plant (ESWPP) Low Lift Pump Building, Chemical Building, and Garage Roof Replacement

Closes 12/18/2026Opened 10/12/2026

City of Toledo·Ohio

68% match

Roof Repairs and Replacement

Closes 11/17/2026Opened 10/30/2026

U.S. Postal Service·Colorado

68% match

Denver, CO Denver P&DC Roof Replacement K95856

Closes 11/20/2026Opened 10/19/2026

U.S. Department Of Energy·New Jersey

68% match

RF Roof Replacement Project

Closes 12/10/2026Opened 10/30/2026

NYS Cornell University·New York

68% match

Cornell University - Replace Roofs at Various Buildings

Closes 11/3/2026Opened 10/15/2026

NYS OGS Design & Construction - Construction Contractors·New York

68% match

Replace Roof & Associated Mechanicals

Closes 11/18/2026Opened 10/13/2026

Massachusetts Yarmouth Housing Authority·Massachusetts

68% match

Roof Replacement - Community Building

Closes 11/12/2026Opened 10/28/2026