Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Nelson Tunnel Repair, ISS-EPA, Mineral County, CO

U.S. Department Of Defense·Nebraska

Nelson Tunnel Repair, ISS-EPA, Mineral County, CO

Closes 12/22/2025$10M – $25MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers is seeking sources for a construction contract to repair the Nelson Tunnel in Mineral County, Colorado. The project involves constructing a bypass adit, rehabilitating the tunnel, and installing a bulkhead to prevent uncontrolled releases of mine-impacted water. The estimated construction cost is between $10 million and $25 million. The contractor will need to have experience with similar projects, including tunnel construction and remedial action services. The project is expected to be a cost-reimbursable contract, and the contractor will need to have an audited accounting system. • The project requires the construction of a bypass adit to connect to the Nelson Tunnel. • The tunnel rehabilitation will involve repairing the existing tunnel to ensure stability and safety. • The installation of a bulkhead will prevent uncontrolled releases of mine-impacted water. • The contractor will need to have experience with cost-reimbursable contracts and audited accounting systems. • The project is located in a remote area with steep terrain, requiring specialized equipment and expertise.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sam McGuffey

[email protected]

(402) 995-2077

Key dates

Opened
12/2/2025
Closes
12/22/2025

Last updated

Details

Type
Sole Source
Industry
Construction
NAICS
237990
Solicitation №
W9128F26SM006

Budget estimate

$10,000,000 – $25,000,000

Based on the estimated construction cost, the budget for this project is expected to be between $10 million and $25 million. This estimate is influenced by the complexity of the project, the location, and the specialized equipment and expertise required. The budget may be higher or lower, depending on the actual costs incurred during the project. Factors that may influence the budget include the cost of materials, labor, and equipment, as well as any unforeseen challenges or changes to the project scope.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Agriculture·Wyoming

Top match · 67%

Nelson Drive Fuel Tank Removal

Closes 11/13/2026Opened 10/23/2026

U.S. Department Of The Interior·Colorado

66% match

B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202

Closes 11/2/2026Opened 10/20/2026

U.S. Department Of Defense·Nebraska

65% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

U.S. Department Of Agriculture·Colorado

65% match

Stove Prairie Campground Gate Replacement

Closes 11/11/2026Opened 10/20/2026

U.S. Department Of Veterans Affairs·Colorado

65% match

554-27-117 Conduct Concrete and Civil Site Repairs.

Closes 11/13/2026Opened 9/28/2026

Colorado Department of Public Health and Environment·Colorado

65% match

NCC WTP Operations and Maintenance

Closes 12/21/2026Opened 10/28/2026

Colorado Department of Public Health and Environment·Colorado

65% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/23/2026

Pennsylvania Department of Environmental Protection·Pennsylvania

65% match

Abandoned Mine Reclamation Project – North Liberty South (Slippery Rock Township, Butler County & Liberty Township, Mercer County)

Closes 12/3/2026Opened 10/30/2026

Colorado Department of Public Health and Environment (CDPHE)·Colorado

65% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/22/2026

California Department of Transportation·California

65% match

Colorado River bridge replacement.

Closes 12/17/2026Opened 10/26/2026

Kentucky Division of Abandoned Mine Lands·Kentucky

65% match

RFB-87-27 24028AMLBAML, JOHNSON COUNTY

Closes 11/3/2026Opened 9/30/2026

U.S. Department Of Defense·Kansas

65% match

Fort Leavenworth Underground Fuel Tank Testing and Repair Services

Closes 11/6/2026Opened 10/7/2026

Alaska Department of Natural Resources, Division of Mining, Land & Water (DMLW‑Mining)·Alaska

64% match

Usibelli Coal Mine Request for Renewal of the Gold Run Pass Permits (Permit Numbers 02-83-796 and S-0602-A)

Closes 11/30/2026Opened 10/8/2026

Metropolitan Council·Minnesota

64% match

Coon Rapids 4-NS-525 Rehabilitation

Closes 11/10/2026Opened 9/24/2026

City of Thornton·Colorado

64% match

New Union Ditch Concrete Channel Conversion and Headgate

Closes 11/5/2026Opened 10/1/2026

Augusta County Service Authority dba Augusta Water·Virginia

64% match

ITB 2702 Augusta Water Collection System Rehabilitation

Closes 12/3/2026Opened 10/29/2026

Colorado Department of Public Health and Environment (CDPHE)·Colorado

64% match

California Gulch Groundwater Monitoring

Closes 11/25/2026Opened 10/30/2026

Mississippi

64% match

Construction of Railroad Rehabilitation Phase 1

Closes 11/2/2026Opened 10/30/2026

Minnesota Department of Administration·Minnesota

64% match

Minnesota Valley State Trail; Nine Mile Creek to Interstate 35W

Closes 11/17/2026Opened 10/15/2026