Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Fiber Fusion Splicer

U.S. Department Of Commerce·Maryland

Fiber Fusion Splicer

Closes 6/26/2026$15k – $40kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The National Institute of Standards and Technology (NIST) is seeking a Fiber Fusion Splicer for use with multi-core and hollow-core fibers. The splicer should meet the requirements outlined in the attached Requirements and Specifications document. The contract will be awarded to the responsible Offeror whose quote is deemed technically acceptable and has the lowest price. The contractor will be required to deliver the splicer within 12 weeks after receipt of the order. Key factors to be considered include technical capability, price, and the ability to meet the delivery schedule. • The Fiber Fusion Splicer must be able to handle multi-core and hollow-core fibers. • The contractor must provide a firm fixed price for the splicer, including all shipping and delivery fees. • The contractor must deliver the splicer within 12 weeks after receipt of the order. • The contractor must provide a technical description of the proposed splicer, including product literature and/or drawings. • The contractor must demonstrate that the proposed splicer meets all the requirements outlined in the Requirements and Specifications document.

Attached files

Contact

Angela Hitt(Contracting Officer)

[email protected]

(303) 497-7305

Key dates

Opened
5/8/2026
Closes
6/26/2026
Duration
12 weeks

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
335921
Solicitation №
NB688000-26-01600

Budget estimate

$15,000 – $40,000

The budget for this contract can be estimated based on the cost of a Fiber Fusion Splicer, which can range from $5,000 to $50,000 or more, depending on the quality and features of the device. Given the requirement for the splicer to handle multi-core and hollow-core fibers, a higher-end model might be necessary, potentially costing around $20,000 to $30,000. However, without more specific information about the exact model or brand required, it's difficult to provide a precise estimate. Additionally, the cost of shipping and any additional features or services required by the contract could further affect the total budget. Therefore, a rough estimate for the budget could be between $15,000 and $40,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·California

Top match · 56%

40--FIBER ROPE ASSEMBLY SE

Closes 11/8/2026Opened 10/27/2026

Oregon Northern Wasco County PUD·Oregon

56% match

RFP No 2026004 Fiber to the Premises (FTTP) Fiber Optic Construction Services

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·Virginia

55% match

59--SPLICE,CONDUCTOR

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

55% match

40--FIBER ROPE ASSEMBLY,SI

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

54% match

40--FIBER ROPE ASSEMBLY,SI

Closes 11/8/2026Opened 10/28/2026

National Aeronautics And Space Administration·Virginia

54% match

Thorlabs Fiber SCALPSS 2

Closes 11/2/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

54% match

40--FIBER ROPE ASSEMBLY,SI

Closes 11/8/2026Opened 10/28/2026

Baltimore County, Maryland·Maryland

54% match

Fiber Optic Construction and Related Services

Closes 1/14/2027Opened 10/21/2026

U.S. Department Of Defense·United States of America

54% match

40--FIBER ROPE ASSEMBLY,SI

Closes 11/8/2026Opened 10/27/2026

Department of Veterans' Affairs·South Carolina

53% match

Veteran Village - Fire Alarm Control Panel Fiber Install

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·Pennsylvania

53% match

60--CABLE ASSEMBLY,FIBE

Closes 11/25/2026Opened 8/27/2026

U.S. Department Of Energy·Idaho

53% match

Fiber Dial Room Refurbishment

Closes 12/11/2026Opened 2/25/2026

National Aeronautics And Space Administration·Alabama

53% match

FTIR to support changes to composition of explosive materials over time

Closes 11/3/2026Opened 10/29/2026

U.S. Department Of The Interior·California

53% match

Y--Folsom Dam Electronic Access Control and Surveillance (EACSS) Fiber Backbone Up

Closes 11/16/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

53% match

16--FIBER OPTIC ADAPTER - AND OTHER REPLACEMENT PARTS

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Energy·New Mexico

53% match

TECHNOLOGY LICENSING OPPORTUNITY: Heat Pipe Reactor Fire Mitigation and Suppression System

Closes 12/19/2026Opened 6/19/2026

University of California Los Angeles·California

53% match

UCLA Center for Health Sciences Fire Sprinkler Retrofit | School of Medicine,(5th & 6th floor) No. 906032

Closes 11/16/2026Opened 10/23/2026

Clemson University·South Carolina

53% match

Emergency Cable Repairs

Closes 2/27/2029Opened 3/20/2024

Oregon Confederated Tribes of Siletz Indians·Oregon

53% match

Construction of Outside Plant Fiber Optic Infrastructure PHASE 1

Closes 12/9/2026Opened 10/26/2026

Massachusetts Department of Developmental Services·Massachusetts

52% match

DDS 27-06 Fire Sprinkler Upgrade Residential Group Home#2, Taunton

Closes 11/18/2026Opened 10/28/2026

City of Vallejo·California

52% match

Fleming Hill SCADA Fiber Replacement Project

Closes 11/19/2026Opened 10/29/2026

U.S. Department Of Energy·Ohio

52% match

TECHNOLOGY LICENSING OPPORTUNITY: PBI High-Temperature Hollow Fiber Membranes

Closes 12/4/2026Opened 6/5/2026

U.S. Department Of Energy·New Mexico

52% match

TECHNOLOGY LICENSING OPPORTUNITY: GreenFuran Direct Allylation

Closes 2/12/2027Opened 8/12/2026

Florida State University·Florida

52% match

FSU InSPIRE Climatic Wind Tunnel

Closes 3/1/2027Opened 10/23/2026

U.S. Department Of Energy·Ohio

52% match

TECHNOLOGY LICENSING OPPORTUNITY: Heat Pipe Reactor Fire Mitigation and Suppression System

Closes 12/19/2026Opened 6/19/2026